Mitigation measures for delay in dam’s project - A case study in Pakistan
Construction sector is known as main sector which contributes major role in term of employment as compared to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many challenges which including construction delay, construction cost o...
Saved in:
Main Authors: | Sohoo, Shujauddin, Syed Mohamad, Syed Burhanuddin Hilmi, Yunus, Riduan, Ahmed Memon, Mansoor |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf http://eprints.uthm.edu.my/11737/ https://doi.org/10.1063/5.0190991 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction of multiple design and build bridge projects: case study in Sabah
by: Chidambaram Ramanathan
Published: (2008) -
Case study to determine the camber of post- tensioned 'I' beam
by: Lee, Poh Huat
Published: (2005) -
Bridge management system : review on current system and a case study
by: Noor Hidayah , Muhamad Jamil
Published: (2012) -
The characteristics of a sustainable bridge : a case study of Second Penang Bridge
by: Ansari, Reza
Published: (2013) -
Forensic engineering testing techniques for structural assesment : a case study on pre-stressed reinforced concrete bridge at Klang Valley
by: Muniandy, Gopinath
Published: (2010)