Mitigation measures for delay in dam’s project - A case study in Pakistan
Construction sector is known as main sector which contributes major role in term of employment as compared to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many challenges which including construction delay, construction cost o...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf http://eprints.uthm.edu.my/11737/ https://doi.org/10.1063/5.0190991 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uthm.eprints.11737 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.117372024-12-17T00:00:58Z http://eprints.uthm.edu.my/11737/ Mitigation measures for delay in dam’s project - A case study in Pakistan Sohoo, Shujauddin Syed Mohamad, Syed Burhanuddin Hilmi Yunus, Riduan Ahmed Memon, Mansoor TG Bridge engineering Construction sector is known as main sector which contributes major role in term of employment as compared to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many challenges which including construction delay, construction cost overrun and also construction quality standards. Pakistan is also facing these problems for the last many decades. The main purpose of this research is to find out the significant factors which contribute construction delay in dam projects of Pakistan. To achieve the objective, a deep literature review and pass research was conducted which helped to identify 48 general factors of delay in the construction sector. On basis of general factors, a questionnaire was designed and distributed among stakeholders of dam projects. The designed questionnaire was based on Likert scale from 1 to 5. Gathered data from respondents was analyzed with help of average mean value which helped to identify the 8 significant factors which causes delay in construction of dam projects of Pakistan. Another questionnaire was prepared based on the critical factors identified in this case study will be beneficial for the stakeholders to control the significant factors in construction of dam projects of Pakistan 2024-03-11 Conference or Workshop Item PeerReviewed text en http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf Sohoo, Shujauddin and Syed Mohamad, Syed Burhanuddin Hilmi and Yunus, Riduan and Ahmed Memon, Mansoor (2024) Mitigation measures for delay in dam’s project - A case study in Pakistan. In: AIP Conference Proceedings. https://doi.org/10.1063/5.0190991 |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English |
topic |
TG Bridge engineering |
spellingShingle |
TG Bridge engineering Sohoo, Shujauddin Syed Mohamad, Syed Burhanuddin Hilmi Yunus, Riduan Ahmed Memon, Mansoor Mitigation measures for delay in dam’s project - A case study in Pakistan |
description |
Construction sector is known as main sector which contributes major role in term of employment as compared
to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many
challenges which including construction delay, construction cost overrun and also construction quality standards. Pakistan
is also facing these problems for the last many decades. The main purpose of this research is to find out the significant
factors which contribute construction delay in dam projects of Pakistan. To achieve the objective, a deep literature review
and pass research was conducted which helped to identify 48 general factors of delay in the construction sector. On basis
of general factors, a questionnaire was designed and distributed among stakeholders of dam projects. The designed
questionnaire was based on Likert scale from 1 to 5. Gathered data from respondents was analyzed with help of average
mean value which helped to identify the 8 significant factors which causes delay in construction of dam projects of
Pakistan. Another questionnaire was prepared based on the critical factors identified in this case study will be beneficial
for the stakeholders to control the significant factors in construction of dam projects of Pakistan |
format |
Conference or Workshop Item |
author |
Sohoo, Shujauddin Syed Mohamad, Syed Burhanuddin Hilmi Yunus, Riduan Ahmed Memon, Mansoor |
author_facet |
Sohoo, Shujauddin Syed Mohamad, Syed Burhanuddin Hilmi Yunus, Riduan Ahmed Memon, Mansoor |
author_sort |
Sohoo, Shujauddin |
title |
Mitigation measures for delay in dam’s project - A case
study in Pakistan |
title_short |
Mitigation measures for delay in dam’s project - A case
study in Pakistan |
title_full |
Mitigation measures for delay in dam’s project - A case
study in Pakistan |
title_fullStr |
Mitigation measures for delay in dam’s project - A case
study in Pakistan |
title_full_unstemmed |
Mitigation measures for delay in dam’s project - A case
study in Pakistan |
title_sort |
mitigation measures for delay in dam’s project - a case
study in pakistan |
publishDate |
2024 |
url |
http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf http://eprints.uthm.edu.my/11737/ https://doi.org/10.1063/5.0190991 |
_version_ |
1818836385300217856 |
score |
13.223943 |