Mitigation measures for delay in dam’s project - A case study in Pakistan

Construction sector is known as main sector which contributes major role in term of employment as compared to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many challenges which including construction delay, construction cost o...

Full description

Saved in:
Bibliographic Details
Main Authors: Sohoo, Shujauddin, Syed Mohamad, Syed Burhanuddin Hilmi, Yunus, Riduan, Ahmed Memon, Mansoor
Format: Conference or Workshop Item
Language:English
Published: 2024
Subjects:
Online Access:http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf
http://eprints.uthm.edu.my/11737/
https://doi.org/10.1063/5.0190991
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.11737
record_format eprints
spelling my.uthm.eprints.117372024-12-17T00:00:58Z http://eprints.uthm.edu.my/11737/ Mitigation measures for delay in dam’s project - A case study in Pakistan Sohoo, Shujauddin Syed Mohamad, Syed Burhanuddin Hilmi Yunus, Riduan Ahmed Memon, Mansoor TG Bridge engineering Construction sector is known as main sector which contributes major role in term of employment as compared to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many challenges which including construction delay, construction cost overrun and also construction quality standards. Pakistan is also facing these problems for the last many decades. The main purpose of this research is to find out the significant factors which contribute construction delay in dam projects of Pakistan. To achieve the objective, a deep literature review and pass research was conducted which helped to identify 48 general factors of delay in the construction sector. On basis of general factors, a questionnaire was designed and distributed among stakeholders of dam projects. The designed questionnaire was based on Likert scale from 1 to 5. Gathered data from respondents was analyzed with help of average mean value which helped to identify the 8 significant factors which causes delay in construction of dam projects of Pakistan. Another questionnaire was prepared based on the critical factors identified in this case study will be beneficial for the stakeholders to control the significant factors in construction of dam projects of Pakistan 2024-03-11 Conference or Workshop Item PeerReviewed text en http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf Sohoo, Shujauddin and Syed Mohamad, Syed Burhanuddin Hilmi and Yunus, Riduan and Ahmed Memon, Mansoor (2024) Mitigation measures for delay in dam’s project - A case study in Pakistan. In: AIP Conference Proceedings. https://doi.org/10.1063/5.0190991
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic TG Bridge engineering
spellingShingle TG Bridge engineering
Sohoo, Shujauddin
Syed Mohamad, Syed Burhanuddin Hilmi
Yunus, Riduan
Ahmed Memon, Mansoor
Mitigation measures for delay in dam’s project - A case study in Pakistan
description Construction sector is known as main sector which contributes major role in term of employment as compared to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many challenges which including construction delay, construction cost overrun and also construction quality standards. Pakistan is also facing these problems for the last many decades. The main purpose of this research is to find out the significant factors which contribute construction delay in dam projects of Pakistan. To achieve the objective, a deep literature review and pass research was conducted which helped to identify 48 general factors of delay in the construction sector. On basis of general factors, a questionnaire was designed and distributed among stakeholders of dam projects. The designed questionnaire was based on Likert scale from 1 to 5. Gathered data from respondents was analyzed with help of average mean value which helped to identify the 8 significant factors which causes delay in construction of dam projects of Pakistan. Another questionnaire was prepared based on the critical factors identified in this case study will be beneficial for the stakeholders to control the significant factors in construction of dam projects of Pakistan
format Conference or Workshop Item
author Sohoo, Shujauddin
Syed Mohamad, Syed Burhanuddin Hilmi
Yunus, Riduan
Ahmed Memon, Mansoor
author_facet Sohoo, Shujauddin
Syed Mohamad, Syed Burhanuddin Hilmi
Yunus, Riduan
Ahmed Memon, Mansoor
author_sort Sohoo, Shujauddin
title Mitigation measures for delay in dam’s project - A case study in Pakistan
title_short Mitigation measures for delay in dam’s project - A case study in Pakistan
title_full Mitigation measures for delay in dam’s project - A case study in Pakistan
title_fullStr Mitigation measures for delay in dam’s project - A case study in Pakistan
title_full_unstemmed Mitigation measures for delay in dam’s project - A case study in Pakistan
title_sort mitigation measures for delay in dam’s project - a case study in pakistan
publishDate 2024
url http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf
http://eprints.uthm.edu.my/11737/
https://doi.org/10.1063/5.0190991