Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture
The primary equipment for oil production, manufactured in a plant, is the wellhead and Christmas tree. By creating a standardized set of risk instruments and a risk management framework, embedding risk management into organizational culture will reduce the overhead of imposing risk management on e...
Saved in:
Main Authors: | Hamid, Abdul, Baba, Ishak, Tamin, Norfauzi, Darmawan, Agong Setyo, Sani, Winardi |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/11283/1/P16766_9919e40fc7dce0c515f8662ab2890f25%2018.pdf http://eprints.uthm.edu.my/11283/ https://doi.org/10.1051/e3sconf/202451715007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Developing risk management framework for wellhead and christmas tree equipment
by: Abd Hamid, Abd Hamid
Published: (2019) -
Noël – Christmas: “Joyeux Noël” “Merry Christmas” / Seng Hui Zanne
by: Seng, Hui Zanne
Published: (2024) -
Forgotten meaning of Christmas
by: Lee, Thomas
Published: (1991) -
Christmas cheer in the city
by: The Star, Malaysia
Published: (1990) -
It's Christmas, Malaysian-style
by: Sunday Star, Malaysia
Published: (1992)