Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture
The primary equipment for oil production, manufactured in a plant, is the wellhead and Christmas tree. By creating a standardized set of risk instruments and a risk management framework, embedding risk management into organizational culture will reduce the overhead of imposing risk management on e...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/11283/1/P16766_9919e40fc7dce0c515f8662ab2890f25%2018.pdf http://eprints.uthm.edu.my/11283/ https://doi.org/10.1051/e3sconf/202451715007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uthm.eprints.11283 |
---|---|
record_format |
eprints |
spelling |
my.uthm.eprints.112832024-07-08T01:45:03Z http://eprints.uthm.edu.my/11283/ Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture Hamid, Abdul Baba, Ishak Tamin, Norfauzi Darmawan, Agong Setyo Sani, Winardi T Technology (General) The primary equipment for oil production, manufactured in a plant, is the wellhead and Christmas tree. By creating a standardized set of risk instruments and a risk management framework, embedding risk management into organizational culture will reduce the overhead of imposing risk management on every new manufacturing project. This study's goal is to improve project success by examining the culture of risk management practices in the production of wellhead and Christmas tree equipment. The information was gathered from companies in Malaysia and Batam, Indonesia, with 161 respondents in a population study. Employing Cronbach's alpha to analyze the descriptive data and determine its significance. The Cronbach alpha and significant value are displayed consequently. The study's data came from a post-survey and survey using a Google link form of companies with stock listed in Malaysia and Batam, Indonesia. These results show that risk culture and staff competency may be created as important variables to improve risk management implementation in manufacturing, based on descriptive statistical analysis. This paper shows how to create a multicultural project management process and raise project success rates by adhering to this approach 2023-12-07 Conference or Workshop Item PeerReviewed text en http://eprints.uthm.edu.my/11283/1/P16766_9919e40fc7dce0c515f8662ab2890f25%2018.pdf Hamid, Abdul and Baba, Ishak and Tamin, Norfauzi and Darmawan, Agong Setyo and Sani, Winardi (2023) Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture. In: 10TH INTERNATIONAL CONFERENCE ON ENGINEERING, TECHNOLOGY, AND INDUSTRIAL APPLICATION, ICETIA 2023 SURAKARTA CENTRAL JAVA INDONESIA. https://doi.org/10.1051/e3sconf/202451715007 |
institution |
Universiti Tun Hussein Onn Malaysia |
building |
UTHM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tun Hussein Onn Malaysia |
content_source |
UTHM Institutional Repository |
url_provider |
http://eprints.uthm.edu.my/ |
language |
English |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Hamid, Abdul Baba, Ishak Tamin, Norfauzi Darmawan, Agong Setyo Sani, Winardi Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture |
description |
The primary equipment for oil production, manufactured in a plant, is the wellhead and Christmas
tree. By creating a standardized set of risk instruments and a risk management framework, embedding risk
management into organizational culture will reduce the overhead of imposing risk management on every new
manufacturing project. This study's goal is to improve project success by examining the culture of risk
management practices in the production of wellhead and Christmas tree equipment. The information was
gathered from companies in Malaysia and Batam, Indonesia, with 161 respondents in a population study.
Employing Cronbach's alpha to analyze the descriptive data and determine its significance. The Cronbach
alpha and significant value are displayed consequently. The study's data came from a post-survey and survey
using a Google link form of companies with stock listed in Malaysia and Batam, Indonesia. These results
show that risk culture and staff competency may be created as important variables to improve risk
management implementation in manufacturing, based on descriptive statistical analysis. This paper shows
how to create a multicultural project management process and raise project success rates by adhering to this
approach |
format |
Conference or Workshop Item |
author |
Hamid, Abdul Baba, Ishak Tamin, Norfauzi Darmawan, Agong Setyo Sani, Winardi |
author_facet |
Hamid, Abdul Baba, Ishak Tamin, Norfauzi Darmawan, Agong Setyo Sani, Winardi |
author_sort |
Hamid, Abdul |
title |
Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture |
title_short |
Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture |
title_full |
Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture |
title_fullStr |
Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture |
title_full_unstemmed |
Increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture |
title_sort |
increasing project success in wellhead and christmas tree manufacturing equipment through risk management culture |
publishDate |
2023 |
url |
http://eprints.uthm.edu.my/11283/1/P16766_9919e40fc7dce0c515f8662ab2890f25%2018.pdf http://eprints.uthm.edu.my/11283/ https://doi.org/10.1051/e3sconf/202451715007 |
_version_ |
1804068324354555904 |
score |
13.160551 |