Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
Nowadays, many manufacturers are now critically evaluating their processes to determine their effectiveness in bringing maximum value to customers where the techniques can give greatly minimize delays, reduce costs, and improve quality. Lean manufacturing is more than a set of tools and techniques a...
Saved in:
Main Author: | Sabah, Mariati |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/20536/1/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf http://eprints.utem.edu.my/id/eprint/20536/2/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf http://eprints.utem.edu.my/id/eprint/20536/ https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=104916 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
Similar Items
-
Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd
by: Lim, Qian Bing
Published: (2012) -
A study on operational issues faced by manufacturing firms implementing Traditional Kanban System (TKS)
by: Mohamad Firdaus, Mohd Yasin
Published: (2014) -
Design and development of SMED quick die change tools for small press dies
by: Siti Solehah, Mohd Rusadi
Published: (2013) -
Development of a new process for producing deep square cups through conical dies
by: Hezam, L.M.A., et al.
Published: (2009) -
Changeover time improvement of pressure die casting machine by single minute exchange of die implementation
by: Embok Resa, Mohammad Afif
Published: (2020)