Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process

Nowadays, many manufacturers are now critically evaluating their processes to determine their effectiveness in bringing maximum value to customers where the techniques can give greatly minimize delays, reduce costs, and improve quality. Lean manufacturing is more than a set of tools and techniques a...

Full description

Saved in:
Bibliographic Details
Main Author: Sabah, Mariati
Format: Thesis
Language:English
English
Published: 2016
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/20536/1/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf
http://eprints.utem.edu.my/id/eprint/20536/2/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf
http://eprints.utem.edu.my/id/eprint/20536/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=104916
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.20536
record_format eprints
spelling my.utem.eprints.205362022-11-11T11:59:03Z http://eprints.utem.edu.my/id/eprint/20536/ Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process Sabah, Mariati T Technology (General) TS Manufactures Nowadays, many manufacturers are now critically evaluating their processes to determine their effectiveness in bringing maximum value to customers where the techniques can give greatly minimize delays, reduce costs, and improve quality. Lean manufacturing is more than a set of tools and techniques and has been widely adopted by many production companies when combined and matured, allow to reduce and eliminate the waste from a company. It can be a continuously look for ways to improve processes and being used in Production Planning. Production planning and scheduling becomes very important part of production management because companies have to react to dynamic market conditions and rising customers' requirements for shorter delivery times, lower prices and better quality and services. The company under study facing the problems of not meeting the parameters production which is under the target, among other parameters such as productive time and target ratio. The study investigated the causes of the problem through statistical analysis of the current achievement. It was found among the problem was human errors and transferring data among the department. This make miscommunication between departments. Kanban system approach was use to solve this problem, at the same time it combined with auto scheduling to eliminate miscommunication among the department on the production target between the supplier and user between two department. This Kanban System improved by integrating the Auto Scheduling tools for better Production planning. This can be shown by the increasing of productive time, eliminating miscommunication in the target. The objective of this study is to highlight the Kanban system implementation together with the Auto Scheduling have improved the manufacturing system as well as achieved "Just ln Time" practice. 2016 Thesis NonPeerReviewed text en http://eprints.utem.edu.my/id/eprint/20536/1/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf text en http://eprints.utem.edu.my/id/eprint/20536/2/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf Sabah, Mariati (2016) Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process. Masters thesis, Universiti Teknikal Malaysia Melaka. https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=104916
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
English
topic T Technology (General)
TS Manufactures
spellingShingle T Technology (General)
TS Manufactures
Sabah, Mariati
Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
description Nowadays, many manufacturers are now critically evaluating their processes to determine their effectiveness in bringing maximum value to customers where the techniques can give greatly minimize delays, reduce costs, and improve quality. Lean manufacturing is more than a set of tools and techniques and has been widely adopted by many production companies when combined and matured, allow to reduce and eliminate the waste from a company. It can be a continuously look for ways to improve processes and being used in Production Planning. Production planning and scheduling becomes very important part of production management because companies have to react to dynamic market conditions and rising customers' requirements for shorter delivery times, lower prices and better quality and services. The company under study facing the problems of not meeting the parameters production which is under the target, among other parameters such as productive time and target ratio. The study investigated the causes of the problem through statistical analysis of the current achievement. It was found among the problem was human errors and transferring data among the department. This make miscommunication between departments. Kanban system approach was use to solve this problem, at the same time it combined with auto scheduling to eliminate miscommunication among the department on the production target between the supplier and user between two department. This Kanban System improved by integrating the Auto Scheduling tools for better Production planning. This can be shown by the increasing of productive time, eliminating miscommunication in the target. The objective of this study is to highlight the Kanban system implementation together with the Auto Scheduling have improved the manufacturing system as well as achieved "Just ln Time" practice.
format Thesis
author Sabah, Mariati
author_facet Sabah, Mariati
author_sort Sabah, Mariati
title Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
title_short Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
title_full Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
title_fullStr Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
title_full_unstemmed Implementation of Kanban Systems through Auto Scheduling tools at Die Bond process
title_sort implementation of kanban systems through auto scheduling tools at die bond process
publishDate 2016
url http://eprints.utem.edu.my/id/eprint/20536/1/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf
http://eprints.utem.edu.my/id/eprint/20536/2/Implementation%20of%20Kanban%20Systems%20through%20Auto%20Scheduling%20tools%20at%20Die%20Bond%20process.pdf
http://eprints.utem.edu.my/id/eprint/20536/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=104916
_version_ 1751540442171703296
score 13.214268