Time series prediction techniques for estimating remaining useful lifetime of cutting tool failure
Prognostic have progressed over in the last few years as a specific function. It provides remaining useful lifetime (RUL) estimation of the targeted equipment or component in which able to be beneficially used by production or maintenance people to be readily advanced through preventive maintenance...
Saved in:
Main Authors: | Asmai, S. A., Burairah, Hussin, Mohd. Yusof, Mokhtar, Shibghatullah, Abdul Samad |
---|---|
Format: | Article |
Language: | English |
Published: |
Praise Worthy Prize
2014
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/14089/1/azirah_Irecos_V2_Accepted.doc http://eprints.utem.edu.my/id/eprint/14089/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Condition-based prognostic tool for industrial equipment maintenance
by: Asmai, Siti Azirah, et al.
Published: (2011) -
Reducing distributed URLS crawling time : A comparison of GUIDS and IDS
by: Suhailan, Safei, et al.
Published: (2014) -
Practical and user friendly tool of analytic hierarchy process for decision making
by: Hasan Basari, Abd Samad, et al.
Published: (2009) -
Exam timetabling using graph colouring approach
by: Burairah, Hussin, et al.
Published: (2011) -
Prediction of corroding pipeline remaining life-time using semi-probabilistic approach
by: Noor, Norhazilan Md., et al.
Published: (2009)