Investigation of single cart gantry crane system performance using scheduling algorithm
This paper investigates the implementation of two types of scheduling algorithm to obtain the best performances of the Single Cart Gantry Crane System (GCS). In this research, Deadline Monotonic Priority Assignment (DMPA) and Earliest Deadline First (EDF) scheduling algorithm are chosen to be imple...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Blue Eyes Intelligence Engineering & Sciences Publication Pvt. Ltd.
2015
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/14048/1/%5B2%5D_F2491014615.pdf http://eprints.utem.edu.my/id/eprint/14048/ http://www.ijsce.org/attachments/File/v4i6/F2491014615.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utem.eprints.14048 |
---|---|
record_format |
eprints |
spelling |
my.utem.eprints.140482015-05-28T04:35:52Z http://eprints.utem.edu.my/id/eprint/14048/ Investigation of single cart gantry crane system performance using scheduling algorithm Omar, Mohamad Syarafuddin Jaafar, Hazriq Izzuan Ghazali, Rozaimi Mohamad, Syahrul Hisham Mohd Annuar, Khalil Azha TK Electrical engineering. Electronics Nuclear engineering This paper investigates the implementation of two types of scheduling algorithm to obtain the best performances of the Single Cart Gantry Crane System (GCS). In this research, Deadline Monotonic Priority Assignment (DMPA) and Earliest Deadline First (EDF) scheduling algorithm are chosen to be implemented. The main ideas of this approach is to find the schedule that more compatible and provide more stable result for the system. The Cart performances will be analyzed in term of Settling Time (Ts) and Overshoot (OS). In this study, a simple PID controller that acts as a basic control structure is used. The application of TRUETIME kernel block also is implemented to be executed in a MATLAB environment. It has been demonstrated that implementation of these two algorithms will help this system to be more stabilized according to appropriate execution time. Blue Eyes Intelligence Engineering & Sciences Publication Pvt. Ltd. 2015-01-05 Article PeerReviewed application/pdf en http://eprints.utem.edu.my/id/eprint/14048/1/%5B2%5D_F2491014615.pdf Omar, Mohamad Syarafuddin and Jaafar, Hazriq Izzuan and Ghazali, Rozaimi and Mohamad, Syahrul Hisham and Mohd Annuar, Khalil Azha (2015) Investigation of single cart gantry crane system performance using scheduling algorithm. International Journal of Soft Computing and Engineering (IJSCE), 4 (6). pp. 134-138. ISSN 2231-2307 http://www.ijsce.org/attachments/File/v4i6/F2491014615.pdf |
institution |
Universiti Teknikal Malaysia Melaka |
building |
UTEM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknikal Malaysia Melaka |
content_source |
UTEM Institutional Repository |
url_provider |
http://eprints.utem.edu.my/ |
language |
English |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Omar, Mohamad Syarafuddin Jaafar, Hazriq Izzuan Ghazali, Rozaimi Mohamad, Syahrul Hisham Mohd Annuar, Khalil Azha Investigation of single cart gantry crane system performance using scheduling algorithm |
description |
This paper investigates the implementation of two types
of scheduling algorithm to obtain the best performances of the Single Cart Gantry Crane System (GCS). In this research, Deadline Monotonic Priority Assignment (DMPA) and Earliest Deadline First (EDF) scheduling algorithm are chosen to be implemented. The main ideas of this approach is to find the schedule that more compatible and provide more stable result for the system. The Cart performances will be analyzed in term of Settling Time (Ts) and Overshoot (OS). In this study, a simple PID controller that acts as a basic control structure is used. The application of TRUETIME kernel block also is implemented to be executed in a MATLAB environment. It has been demonstrated that implementation of these two algorithms will help this system to be more stabilized according to appropriate execution time. |
format |
Article |
author |
Omar, Mohamad Syarafuddin Jaafar, Hazriq Izzuan Ghazali, Rozaimi Mohamad, Syahrul Hisham Mohd Annuar, Khalil Azha |
author_facet |
Omar, Mohamad Syarafuddin Jaafar, Hazriq Izzuan Ghazali, Rozaimi Mohamad, Syahrul Hisham Mohd Annuar, Khalil Azha |
author_sort |
Omar, Mohamad Syarafuddin |
title |
Investigation of single cart gantry crane system performance using scheduling algorithm |
title_short |
Investigation of single cart gantry crane system performance using scheduling algorithm |
title_full |
Investigation of single cart gantry crane system performance using scheduling algorithm |
title_fullStr |
Investigation of single cart gantry crane system performance using scheduling algorithm |
title_full_unstemmed |
Investigation of single cart gantry crane system performance using scheduling algorithm |
title_sort |
investigation of single cart gantry crane system performance using scheduling algorithm |
publisher |
Blue Eyes Intelligence Engineering & Sciences Publication Pvt. Ltd. |
publishDate |
2015 |
url |
http://eprints.utem.edu.my/id/eprint/14048/1/%5B2%5D_F2491014615.pdf http://eprints.utem.edu.my/id/eprint/14048/ http://www.ijsce.org/attachments/File/v4i6/F2491014615.pdf |
_version_ |
1665905572577280000 |
score |
13.160551 |