A comparison of stepwise and fuzzy multiple regression analysis techniques for managing software project risks: Analysis phase
Risk is not always avoidable, but it is controllable. The aim of this study is to identify whether those techniques are effective in reducing software failure. This motivates the authors to continue the effort to enrich the managing software project risks with consider mining and quantitative approa...
Saved in:
Main Authors: | Abd Rafe, ElZamly, Burairah, Hussin |
---|---|
Format: | Article |
Language: | English |
Published: |
Science Publications
2014
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/12251/1/A_COMPARISON_OF_STEPWISE_AND_FUZZY_MULTIPLE_JCS.pdf http://eprints.utem.edu.my/id/eprint/12251/ https://thescipub.com/abstract/10.3844/jcssp.2014.1725.1742 https://doi.org/10.3844/jcssp.2014.1725.1742 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Mitigating software maintenance project risks with stepwise regression analysis techniques
by: Elzamly, Abdelrafe, et al.
Published: (2014) -
Managing Software Project Risks Using Stepwise And Fuzzy Regression Analysis Modelling Techniques
by: Abdelrafe M.S., Elzamly
Published: (2016) -
Managing software project risks (Analysis Phase) with proposed fuzzy regression analysis modelling techniques with fuzzy concepts
by: Abdelrafe , Elzamly, et al.
Published: (2014) -
Managing Software Project Risks (Design Phase) with Proposed Fuzzy Regression Analysis Techniques With Fuzzy Concepts
by: Abdelrafe , Elzamly, et al.
Published: (2013) -
Managing software project risks (planning phase) with proposed fuzzy regression analysis techniques with fuzzy concepts
by: Elzamly, Abdelrafe, et al.
Published: (2014)