Supply Chain Management: After Business Process Re-Engineering

This paper is prepared to provide a review of how an automotive manufacturer, ISUZU HICOM Malaysia Co. Ltd. sustained the supply chain management after business process re-engineering in 2007. One of the authors is currently undergoing industrial attachment and has spent almost 6 months researching...

Full description

Saved in:
Bibliographic Details
Main Authors: Wan Mahmood, Wan Hasrulnizzam, Muhamad, Mohd Razali, Mat Tahar, Nurulain
Format: Conference or Workshop Item
Language:English
English
Published: 2009
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/11229/2/WASET_2009_Tokyo.pdf
http://eprints.utem.edu.my/id/eprint/11229/3/Supply_Chain_Management_After_Business_Process_Re_Engineering.pdf
http://eprints.utem.edu.my/id/eprint/11229/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utem.eprints.11229
record_format eprints
spelling my.utem.eprints.112292015-05-28T04:16:03Z http://eprints.utem.edu.my/id/eprint/11229/ Supply Chain Management: After Business Process Re-Engineering Wan Mahmood, Wan Hasrulnizzam Muhamad, Mohd Razali Mat Tahar, Nurulain T Technology (General) This paper is prepared to provide a review of how an automotive manufacturer, ISUZU HICOM Malaysia Co. Ltd. sustained the supply chain management after business process re-engineering in 2007. One of the authors is currently undergoing industrial attachment and has spent almost 6 months researching in the production and operation management system of the company. This study was carried out as part of the tasks in the attachment program. The result shows that delivery lateness and outsourcing are the main barriers that affected productivity. From the gap analysis, the authors found that new business process operation had improved suppliers delivery performance. 2009-05-29 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utem.edu.my/id/eprint/11229/2/WASET_2009_Tokyo.pdf application/pdf en http://eprints.utem.edu.my/id/eprint/11229/3/Supply_Chain_Management_After_Business_Process_Re_Engineering.pdf Wan Mahmood, Wan Hasrulnizzam and Muhamad, Mohd Razali and Mat Tahar, Nurulain (2009) Supply Chain Management: After Business Process Re-Engineering. In: World Academy of Science Engineering and Technology, 27-29 May 2009, Tokyo, Japan.
institution Universiti Teknikal Malaysia Melaka
building UTEM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknikal Malaysia Melaka
content_source UTEM Institutional Repository
url_provider http://eprints.utem.edu.my/
language English
English
topic T Technology (General)
spellingShingle T Technology (General)
Wan Mahmood, Wan Hasrulnizzam
Muhamad, Mohd Razali
Mat Tahar, Nurulain
Supply Chain Management: After Business Process Re-Engineering
description This paper is prepared to provide a review of how an automotive manufacturer, ISUZU HICOM Malaysia Co. Ltd. sustained the supply chain management after business process re-engineering in 2007. One of the authors is currently undergoing industrial attachment and has spent almost 6 months researching in the production and operation management system of the company. This study was carried out as part of the tasks in the attachment program. The result shows that delivery lateness and outsourcing are the main barriers that affected productivity. From the gap analysis, the authors found that new business process operation had improved suppliers delivery performance.
format Conference or Workshop Item
author Wan Mahmood, Wan Hasrulnizzam
Muhamad, Mohd Razali
Mat Tahar, Nurulain
author_facet Wan Mahmood, Wan Hasrulnizzam
Muhamad, Mohd Razali
Mat Tahar, Nurulain
author_sort Wan Mahmood, Wan Hasrulnizzam
title Supply Chain Management: After Business Process Re-Engineering
title_short Supply Chain Management: After Business Process Re-Engineering
title_full Supply Chain Management: After Business Process Re-Engineering
title_fullStr Supply Chain Management: After Business Process Re-Engineering
title_full_unstemmed Supply Chain Management: After Business Process Re-Engineering
title_sort supply chain management: after business process re-engineering
publishDate 2009
url http://eprints.utem.edu.my/id/eprint/11229/2/WASET_2009_Tokyo.pdf
http://eprints.utem.edu.my/id/eprint/11229/3/Supply_Chain_Management_After_Business_Process_Re_Engineering.pdf
http://eprints.utem.edu.my/id/eprint/11229/
_version_ 1665905453979140096
score 13.160551