Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks

The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. A...

Full description

Saved in:
Bibliographic Details
Main Author: Bahaudin, Ahmad Yusni
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://eprints.usm.my/43194/1/AHMAD%20YUSNI%20BIN%20BAHAUDIN.pdf
http://eprints.usm.my/43194/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.43194
record_format eprints
spelling my.usm.eprints.43194 http://eprints.usm.my/43194/ Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks Bahaudin, Ahmad Yusni TH1-9745 Building construction The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. An effective project control system must be able to anticipate emerging or unforeseeable problems, a deviation from the classical project methods which are often slow where problems may already exist. Early warnings can be included as part of the project risk management theories because “problem” and “risk” are apparently related to each other. The aim of this study is to develop a preventive cost control model that can be adopted by contractors to prevent or reduce unnecessary cost overruns. 2011-11 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/43194/1/AHMAD%20YUSNI%20BIN%20BAHAUDIN.pdf Bahaudin, Ahmad Yusni (2011) Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks. PhD thesis, Universiti Sains Malaysia.
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Bahaudin, Ahmad Yusni
Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
description The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. An effective project control system must be able to anticipate emerging or unforeseeable problems, a deviation from the classical project methods which are often slow where problems may already exist. Early warnings can be included as part of the project risk management theories because “problem” and “risk” are apparently related to each other. The aim of this study is to develop a preventive cost control model that can be adopted by contractors to prevent or reduce unnecessary cost overruns.
format Thesis
author Bahaudin, Ahmad Yusni
author_facet Bahaudin, Ahmad Yusni
author_sort Bahaudin, Ahmad Yusni
title Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
title_short Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
title_full Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
title_fullStr Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
title_full_unstemmed Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
title_sort developing a preventive cost control model by utilising early warnings and risks
publishDate 2011
url http://eprints.usm.my/43194/1/AHMAD%20YUSNI%20BIN%20BAHAUDIN.pdf
http://eprints.usm.my/43194/
_version_ 1643710684306866176
score 13.160551