Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks

The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. A...

Full description

Saved in:
Bibliographic Details
Main Author: Bahaudin, Ahmad Yusni
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://eprints.usm.my/43194/1/AHMAD%20YUSNI%20BIN%20BAHAUDIN.pdf
http://eprints.usm.my/43194/
Tags: Add Tag
No Tags, Be the first to tag this record!