Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects

There is great concern in Uganda about delays and cost overruns in public sector construction projects because such projects are implemented using taxpayers' money. At the national and international levels, there is considerable debate regarding how to minimise project delays and cost overr...

Full description

Saved in:
Bibliographic Details
Main Authors: Alinaitwe, Henry, Apolot, Ruth, Tindiwensi, Dan
Format: Article
Language:English
Published: Penerbit Universiti Sains Malaysia 2013
Subjects:
Online Access:http://eprints.usm.my/42068/1/JCDC_18%282%29_2013-Art._3_%2833-47%29.pdf
http://eprints.usm.my/42068/
http://web.usm.my/jcdc/vol18_2_2013/JCDC%2018(2)%202013-Art.%203%20(33-47).pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.42068
record_format eprints
spelling my.usm.eprints.42068 http://eprints.usm.my/42068/ Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects Alinaitwe, Henry Apolot, Ruth Tindiwensi, Dan TH1-9745 Building construction There is great concern in Uganda about delays and cost overruns in public sector construction projects because such projects are implemented using taxpayers' money. At the national and international levels, there is considerable debate regarding how to minimise project delays and cost overruns. The main objective of this study was to investigate the causes of construction project delays and cost overruns in Uganda's public sector. Specifically, this study was conducted to identify the causes of delays and overruns and to rank them according to their frequency, severity and importance. The Civil Aviation Authority (CAA) was selected as a case study as a means of validating the results of the survey. Frequency index, severity index and importance index values were computed and all 20 factors involved were ranked. The five most important causes of delays in construction projects were found to be the following: changes to the scope of work, delayed payments, poor monitoring and control, the high cost of capital and political insecurity and instability. The relationship between the factors that cause delays and those that cause cost overruns was found to be moderate. Recommendations are made for improved project management, a change from the traditional contract type to the design–build type and improved cash flow on the part of the client to reduce payment delays. The results of this research should help construction practitioners, policy makers and researchers in the field of construction management. Penerbit Universiti Sains Malaysia 2013 Article PeerReviewed application/pdf en http://eprints.usm.my/42068/1/JCDC_18%282%29_2013-Art._3_%2833-47%29.pdf Alinaitwe, Henry and Apolot, Ruth and Tindiwensi, Dan (2013) Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects. Journal of Construction in Developing Countries , 18 (2). pp. 33-47. ISSN 1823-6499 http://web.usm.my/jcdc/vol18_2_2013/JCDC%2018(2)%202013-Art.%203%20(33-47).pdf
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Alinaitwe, Henry
Apolot, Ruth
Tindiwensi, Dan
Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects
description There is great concern in Uganda about delays and cost overruns in public sector construction projects because such projects are implemented using taxpayers' money. At the national and international levels, there is considerable debate regarding how to minimise project delays and cost overruns. The main objective of this study was to investigate the causes of construction project delays and cost overruns in Uganda's public sector. Specifically, this study was conducted to identify the causes of delays and overruns and to rank them according to their frequency, severity and importance. The Civil Aviation Authority (CAA) was selected as a case study as a means of validating the results of the survey. Frequency index, severity index and importance index values were computed and all 20 factors involved were ranked. The five most important causes of delays in construction projects were found to be the following: changes to the scope of work, delayed payments, poor monitoring and control, the high cost of capital and political insecurity and instability. The relationship between the factors that cause delays and those that cause cost overruns was found to be moderate. Recommendations are made for improved project management, a change from the traditional contract type to the design–build type and improved cash flow on the part of the client to reduce payment delays. The results of this research should help construction practitioners, policy makers and researchers in the field of construction management.
format Article
author Alinaitwe, Henry
Apolot, Ruth
Tindiwensi, Dan
author_facet Alinaitwe, Henry
Apolot, Ruth
Tindiwensi, Dan
author_sort Alinaitwe, Henry
title Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects
title_short Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects
title_full Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects
title_fullStr Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects
title_full_unstemmed Investigation Into The Causes Of Delays And Cost Overruns In Uganda's Public Sector Construction Projects
title_sort investigation into the causes of delays and cost overruns in uganda's public sector construction projects
publisher Penerbit Universiti Sains Malaysia
publishDate 2013
url http://eprints.usm.my/42068/1/JCDC_18%282%29_2013-Art._3_%2833-47%29.pdf
http://eprints.usm.my/42068/
http://web.usm.my/jcdc/vol18_2_2013/JCDC%2018(2)%202013-Art.%203%20(33-47).pdf
_version_ 1643710401602387968
score 13.209306