Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India

This paper aims at studying the factors that contribute to time delay and cost overrun of Road over Bridge (ROB) projects in India. Data for the research study were collected from 62 respondents, including owners, contractors, and consultants of ROB projects. The literature survey and the questio...

Full description

Saved in:
Bibliographic Details
Main Authors: Venkateswaran, Chandrasekaran Balaji, Murugasan, Rajiah
Format: Article
Language:English
Published: Penerbit Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/41426/1/jcdc2017.22.s1.5.pdf
http://eprints.usm.my/41426/
http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.5.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.41426
record_format eprints
spelling my.usm.eprints.41426 http://eprints.usm.my/41426/ Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India Venkateswaran, Chandrasekaran Balaji Murugasan, Rajiah TH1-9745 Building construction This paper aims at studying the factors that contribute to time delay and cost overrun of Road over Bridge (ROB) projects in India. Data for the research study were collected from 62 respondents, including owners, contractors, and consultants of ROB projects. The literature survey and the questionnaire survey helped in identifying 29 factors. The topmost factors were ranked based on the frequency of occurrences. The correlation among owners, contractors, and consultants on ranking of factors was derived by Spearman rank correlation. Factor analysis was used to classify the factors into groups and identify the key groups responsible for time delay and cost overrun of projects. This study will help all stakeholders of ROB projects in India to understand the factors and thereby reduce time delay and cost overrun as well as expedite their completion. Penerbit Universiti Sains Malaysia 2017 Article PeerReviewed application/pdf en http://eprints.usm.my/41426/1/jcdc2017.22.s1.5.pdf Venkateswaran, Chandrasekaran Balaji and Murugasan, Rajiah (2017) Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India. Journal of Construction in Developing Countries , 22 (1). pp. 79-96. ISSN 1823-6499 http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.5.pdf
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic TH1-9745 Building construction
spellingShingle TH1-9745 Building construction
Venkateswaran, Chandrasekaran Balaji
Murugasan, Rajiah
Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
description This paper aims at studying the factors that contribute to time delay and cost overrun of Road over Bridge (ROB) projects in India. Data for the research study were collected from 62 respondents, including owners, contractors, and consultants of ROB projects. The literature survey and the questionnaire survey helped in identifying 29 factors. The topmost factors were ranked based on the frequency of occurrences. The correlation among owners, contractors, and consultants on ranking of factors was derived by Spearman rank correlation. Factor analysis was used to classify the factors into groups and identify the key groups responsible for time delay and cost overrun of projects. This study will help all stakeholders of ROB projects in India to understand the factors and thereby reduce time delay and cost overrun as well as expedite their completion.
format Article
author Venkateswaran, Chandrasekaran Balaji
Murugasan, Rajiah
author_facet Venkateswaran, Chandrasekaran Balaji
Murugasan, Rajiah
author_sort Venkateswaran, Chandrasekaran Balaji
title Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
title_short Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
title_full Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
title_fullStr Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
title_full_unstemmed Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
title_sort time delay and cost overrun of road over bridge (rob) construction projects in india
publisher Penerbit Universiti Sains Malaysia
publishDate 2017
url http://eprints.usm.my/41426/1/jcdc2017.22.s1.5.pdf
http://eprints.usm.my/41426/
http://web.usm.my/jcdc/vol22_s1_2017/jcdc2017.22.s1.5.pdf
_version_ 1643710218738073600
score 13.19449