Causes of construction delay: a case study in Libya
Delays on construction projects are a universal phenomenon. And it is probable that most construction projects will incur some sort of a delay before they are completed. Even though various studies have been considered into the causes affecting delays, these studies seldom discuss common and gene...
Saved in:
Main Authors: | Fackroon, Ellafi H., Kadir Pakir, Abdul Hamid, Omran, Abdelnaser |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.usm.my/34633/1/HBP15.pdf http://eprints.usm.my/34633/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Critical success factors in construction industry in Sudan
by: Abdalrahman, Salma, et al.
Published: (2008) -
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013) -
Assessment of Influential Causes of Construction Project
Delay in Malaysian Private Housing from Developer’s
Viewpoint
by: Othuman Mydin, M.A., et al.
Published: (2014) -
Mitigation of delay in industrial construction projects;
case of Iran
by: Ebrahimzadeh Sepasgozar, Samad Mohammad
Published: (2008) -
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)