Improving knowledge capture during conceptual design phase of building projects
Incomplete knowledge flow between architects and mechanical/electrical engineers engenders huge expense and untimely delivery of building projects. It is essential to consider mechanical electrical requirements from the early stages of design; and many experienced architects acknowledge this knowled...
Saved in:
Main Author: | Pourzolfaghar, Zohreh |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Online Access: | http://psasir.upm.edu.my/id/eprint/42209/1/FK%202011%2067%20ir.pdf http://psasir.upm.edu.my/id/eprint/42209/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A technique to capture multi-disciplinary tacit knowledge during the conceptual design phase of a building project
by: Pourzolfaghar, Zohreh, et al.
Published: (2014) -
Impacts of adding knowledge flow to an activity‑based framework for conceptual design phase on performance of building projects
by: Pourzolfaghar, Zohreh, et al.
Published: (2014) -
Explicating mechanical and electrical knowledge for design phase of green building projects
by: Pourzolfaghar, Zohreh, et al.
Published: (2016) -
Improving dynamic knowledge movements with a knowledge movements with a knowledge-based framework during conceptual design of a green building project
by: Pourzolfaghar, Zohreh, et al.
Published: (2013) -
Capturing Tacit Knowledge in oil and gas project Using Storytelling
by: Mohd Syafiq b. Saifullah, Mohd Syafiq
Published: (2012)