An effective 4–phased framework for scheduling job-shop manufacturing systems using weighted NSGA-II
Improving the performance of manufacturing systems is a vital issue in today’s rival market. For this purpose, during the last decade, scientists have considered more than one objective function while scheduling a production line. This paper develops a 4-phased fuzzy framework to identify effective...
Saved in:
Main Authors: | Delgoshaei, Aidin, Mohd Ariffin, Mohd Khairol Anuar, Leman, Zulkiflle |
---|---|
Format: | Article |
Published: |
Multidisciplinary Digital Publishing Institute
2022
|
Online Access: | http://psasir.upm.edu.my/id/eprint/100231/ https://www.mdpi.com/2227-7390/10/23/4607 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Review evolution of dual-resource-constrained scheduling problems in manufacturing systems: modeling and scheduling methods’ trends
by: Delgoshaei, Aidin, et al.
Published: (2023) -
Scheduling dynamic cellular manufacturing systems in the presence of cost uncertainty using heuristic method
by: Delgoshaei, Aidin
Published: (2016) -
Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms
by: Mohd Ariffin, Mohd Khairol Anuar, et al.
Published: (2015) -
A multi-period scheduling of dynamic cellular manufacturing systems in the presence of cost uncertainty
by: Delgoshaei, Aidin, et al.
Published: (2016) -
A new method for decreasing cell-load variation in dynamic cellular manufacturing systems
by: Delgoshaei, Aidin, et al.
Published: (2016)