Tube failures due to cooling process problem and foreign materials in power plants
Cooling process which uses water for heat transfer is an essential factor in coal-fired and nuclear plants. Loss of cooling upset can force the plants to shut down. In particular, this paper reports visual inspections and metallurgical examinations on the failed SA210-A1 right-hand side (RHS) water...
Saved in:
Main Authors: | Ahmad J., Purbolaksono J., Beng L.C. |
---|---|
Other Authors: | 57210531371 |
Format: | Article |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Failure analysis on a primary superheater tube of a power plant
by: Purbolaksono J., et al.
Published: (2023) -
Failure investigation on rear water wall tube of boiler
by: Ahmad J., et al.
Published: (2023) -
Root cause failure analysis of a division wall superheater tube of a coal-fired power station
by: Rahman M.M., et al.
Published: (2023) -
Root cause failure analysis of final superheater tube from a coal fired power station
by: Rahman M.M., et al.
Published: (2023) -
Failure analysis on high temperature superheater Inconel� 800 tube
by: Ahmad J., et al.
Published: (2023)