Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia

Economic analysis; Renewable energy resources; Secondary batteries; Battery energy storage systems; Case-studies; Energy targets; Malaysia; Power; Renewable energies; Renewable energy penetrations; Techno-Economic analysis; Techno-economics; Virtual power plants; Battery storage

Saved in:
Bibliographic Details
Main Authors: Abdullah W.S.W., Osman M., Kadir M.Z.A.A., Verayiah R., Aziz N.F.A., Rasheed M.A.
Other Authors: 57209655076
Format: Article
Published: Elsevier Ltd 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-26173
record_format dspace
spelling my.uniten.dspace-261732023-05-29T17:07:27Z Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia Abdullah W.S.W. Osman M. Kadir M.Z.A.A. Verayiah R. Aziz N.F.A. Rasheed M.A. 57209655076 7201930315 25947297000 26431682500 57221906825 57220109803 Economic analysis; Renewable energy resources; Secondary batteries; Battery energy storage systems; Case-studies; Energy targets; Malaysia; Power; Renewable energies; Renewable energy penetrations; Techno-Economic analysis; Techno-economics; Virtual power plants; Battery storage Renewable Energy (RE) penetration to power system has been a trend in recent years. Malaysia under the new RE target has a vision to achieve 20% of RE in energy mix by 2025. Flexibility and stability of power system can be a concern due to high penetration of RE in the system. Battery Energy Storage System (BESS) has been identified as one of the possible solutions to mitigate this issue. This paper will discuss the capabilities of this technology to reduce peak demand charge and potential to solve power system issues and the techno-economic analysis for this technology. This covers technical and economic analysis to ensure viability and feasibility of this technology. This is a novel analysis in terms of Malaysian energy market as BESS is considered relatively new technology and still in early stage in terms of commercial deployment. � 2021 Elsevier Ltd Final 2023-05-29T09:07:27Z 2023-05-29T09:07:27Z 2021 Article 10.1016/j.est.2021.102568 2-s2.0-85105698135 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85105698135&doi=10.1016%2fj.est.2021.102568&partnerID=40&md5=5320fea0f4b093c4a4bfd6b19c3599db https://irepository.uniten.edu.my/handle/123456789/26173 38 102568 Elsevier Ltd Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Economic analysis; Renewable energy resources; Secondary batteries; Battery energy storage systems; Case-studies; Energy targets; Malaysia; Power; Renewable energies; Renewable energy penetrations; Techno-Economic analysis; Techno-economics; Virtual power plants; Battery storage
author2 57209655076
author_facet 57209655076
Abdullah W.S.W.
Osman M.
Kadir M.Z.A.A.
Verayiah R.
Aziz N.F.A.
Rasheed M.A.
format Article
author Abdullah W.S.W.
Osman M.
Kadir M.Z.A.A.
Verayiah R.
Aziz N.F.A.
Rasheed M.A.
spellingShingle Abdullah W.S.W.
Osman M.
Kadir M.Z.A.A.
Verayiah R.
Aziz N.F.A.
Rasheed M.A.
Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia
author_sort Abdullah W.S.W.
title Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia
title_short Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia
title_full Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia
title_fullStr Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia
title_full_unstemmed Techno-economics analysis of battery energy storage system (bess) design for virtual power plant (VPP)�A case study in Malaysia
title_sort techno-economics analysis of battery energy storage system (bess) design for virtual power plant (vpp)�a case study in malaysia
publisher Elsevier Ltd
publishDate 2023
_version_ 1806424040431157248
score 13.188404