Techno-economics analysis of battery energy storage system (BESS) design for virtual power plant (VPP)-a case study in Malaysia

Renewable Energy (RE) penetration to power system has been a trend in recent years. Malaysia under the new RE target has a vision to achieve 20% of RE in energy mix by 2025. Flexibility and stability of power system can be a concern due to high penetration of RE in the system. Battery Energy Storage...

Full description

Saved in:
Bibliographic Details
Main Authors: Wan Abdullah, Wan Syakirah, Osman, Miszaina, Ab Kadir, Mohd Zainal Abidin, Verayiah, Renuga, Ab Aziz, Nur Fadilah, Abdul Rasheed, Mohamed
Format: Article
Published: Elsevier BV 2021
Online Access:http://psasir.upm.edu.my/id/eprint/95307/
https://www.sciencedirect.com/science/article/pii/S2352152X21003133
Tags: Add Tag
No Tags, Be the first to tag this record!