Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers

Steam boiler also known as steam generator is an integral component in thermal power plants requiring effective maintenance scheduling to extend the overall life cycle of the boiler. However, steam boilers are commonly plagued with issues such as boiler shutdown and tube leakage. Industry experts ad...

Full description

Saved in:
Bibliographic Details
Main Authors: Fuzi N.F.A., Ismail F.B.
Other Authors: 57211807166
Format: Article
Published: Blue Eyes Intelligence Engineering and Sciences Publication 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-24385
record_format dspace
spelling my.uniten.dspace-243852023-05-29T15:23:09Z Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers Fuzi N.F.A. Ismail F.B. 57211807166 58027086700 Steam boiler also known as steam generator is an integral component in thermal power plants requiring effective maintenance scheduling to extend the overall life cycle of the boiler. However, steam boilers are commonly plagued with issues such as boiler shutdown and tube leakage. Industry experts adopted preventative maintenance to overcome the repetition of outage in steam boilers. This method is flawed in the aspect of redundant maintenance activities. The repetition in maintenance activities will lead to reduced work productivity and increased maintenance operational costs. In this study, a maintenance optimization system specialized in ranking, prioritization and optimization based on Analytical Hierarchy Process (AHP) and Particle Swarm Optimization (PSO) are chosen. The AHP is used to rearrange the maintenance activities according to its priority while the PSO is an intelligent swarm used to optimize the operational duration and maintenance cost based on the result formed from AHP after implemented using MATLAB software. This work proposes maintenance scheduling based on minimization of the objectives focusing on the forming new list of the maintenance activities with the optimal operational duration and maintenance cost. � BEIESP. Final 2023-05-29T07:23:09Z 2023-05-29T07:23:09Z 2019 Article 10.35940/ijrte.C1007.1083S19 2-s2.0-85075043129 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85075043129&doi=10.35940%2fijrte.C1007.1083S19&partnerID=40&md5=6daef7e123aa7a76d24fbd7905956ebe https://irepository.uniten.edu.my/handle/123456789/24385 8 3 Special Issue 31 35 All Open Access, Bronze Blue Eyes Intelligence Engineering and Sciences Publication Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Steam boiler also known as steam generator is an integral component in thermal power plants requiring effective maintenance scheduling to extend the overall life cycle of the boiler. However, steam boilers are commonly plagued with issues such as boiler shutdown and tube leakage. Industry experts adopted preventative maintenance to overcome the repetition of outage in steam boilers. This method is flawed in the aspect of redundant maintenance activities. The repetition in maintenance activities will lead to reduced work productivity and increased maintenance operational costs. In this study, a maintenance optimization system specialized in ranking, prioritization and optimization based on Analytical Hierarchy Process (AHP) and Particle Swarm Optimization (PSO) are chosen. The AHP is used to rearrange the maintenance activities according to its priority while the PSO is an intelligent swarm used to optimize the operational duration and maintenance cost based on the result formed from AHP after implemented using MATLAB software. This work proposes maintenance scheduling based on minimization of the objectives focusing on the forming new list of the maintenance activities with the optimal operational duration and maintenance cost. � BEIESP.
author2 57211807166
author_facet 57211807166
Fuzi N.F.A.
Ismail F.B.
format Article
author Fuzi N.F.A.
Ismail F.B.
spellingShingle Fuzi N.F.A.
Ismail F.B.
Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
author_sort Fuzi N.F.A.
title Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
title_short Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
title_full Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
title_fullStr Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
title_full_unstemmed Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
title_sort intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
publisher Blue Eyes Intelligence Engineering and Sciences Publication
publishDate 2023
_version_ 1806427696946741248
score 13.214268