Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers
Steam boiler also known as steam generator is an integral component in thermal power plants requiring effective maintenance scheduling to extend the overall life cycle of the boiler. However, steam boilers are commonly plagued with issues such as boiler shutdown and tube leakage. Industry experts ad...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
Blue Eyes Intelligence Engineering and Sciences Publication
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-24385 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-243852023-05-29T15:23:09Z Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers Fuzi N.F.A. Ismail F.B. 57211807166 58027086700 Steam boiler also known as steam generator is an integral component in thermal power plants requiring effective maintenance scheduling to extend the overall life cycle of the boiler. However, steam boilers are commonly plagued with issues such as boiler shutdown and tube leakage. Industry experts adopted preventative maintenance to overcome the repetition of outage in steam boilers. This method is flawed in the aspect of redundant maintenance activities. The repetition in maintenance activities will lead to reduced work productivity and increased maintenance operational costs. In this study, a maintenance optimization system specialized in ranking, prioritization and optimization based on Analytical Hierarchy Process (AHP) and Particle Swarm Optimization (PSO) are chosen. The AHP is used to rearrange the maintenance activities according to its priority while the PSO is an intelligent swarm used to optimize the operational duration and maintenance cost based on the result formed from AHP after implemented using MATLAB software. This work proposes maintenance scheduling based on minimization of the objectives focusing on the forming new list of the maintenance activities with the optimal operational duration and maintenance cost. � BEIESP. Final 2023-05-29T07:23:09Z 2023-05-29T07:23:09Z 2019 Article 10.35940/ijrte.C1007.1083S19 2-s2.0-85075043129 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85075043129&doi=10.35940%2fijrte.C1007.1083S19&partnerID=40&md5=6daef7e123aa7a76d24fbd7905956ebe https://irepository.uniten.edu.my/handle/123456789/24385 8 3 Special Issue 31 35 All Open Access, Bronze Blue Eyes Intelligence Engineering and Sciences Publication Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
Steam boiler also known as steam generator is an integral component in thermal power plants requiring effective maintenance scheduling to extend the overall life cycle of the boiler. However, steam boilers are commonly plagued with issues such as boiler shutdown and tube leakage. Industry experts adopted preventative maintenance to overcome the repetition of outage in steam boilers. This method is flawed in the aspect of redundant maintenance activities. The repetition in maintenance activities will lead to reduced work productivity and increased maintenance operational costs. In this study, a maintenance optimization system specialized in ranking, prioritization and optimization based on Analytical Hierarchy Process (AHP) and Particle Swarm Optimization (PSO) are chosen. The AHP is used to rearrange the maintenance activities according to its priority while the PSO is an intelligent swarm used to optimize the operational duration and maintenance cost based on the result formed from AHP after implemented using MATLAB software. This work proposes maintenance scheduling based on minimization of the objectives focusing on the forming new list of the maintenance activities with the optimal operational duration and maintenance cost. � BEIESP. |
author2 |
57211807166 |
author_facet |
57211807166 Fuzi N.F.A. Ismail F.B. |
format |
Article |
author |
Fuzi N.F.A. Ismail F.B. |
spellingShingle |
Fuzi N.F.A. Ismail F.B. Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers |
author_sort |
Fuzi N.F.A. |
title |
Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers |
title_short |
Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers |
title_full |
Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers |
title_fullStr |
Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers |
title_full_unstemmed |
Intelligent maintenance prioritization and optimization strategies for thermal power plant boilers |
title_sort |
intelligent maintenance prioritization and optimization strategies for thermal power plant boilers |
publisher |
Blue Eyes Intelligence Engineering and Sciences Publication |
publishDate |
2023 |
_version_ |
1806427696946741248 |
score |
13.214268 |