Tunneling in limestone rock using TBM method for MRT projects near cochrane station
Tunnel construction in Kuala Lumpur area are to be build due to the increasing traffic congestion in urban areas and increasing land price. Underground structure like tunneling can preserve the land above while providing a route for Mass Rapid Transport (MRT) line for transportation. MRT line in Kua...
Saved in:
Main Authors: | Pauzi N.I.M., Radhi M.S.M., Wong L.S., Omar H. |
---|---|
Other Authors: | 26536518100 |
Format: | Article |
Published: |
E-Journal of Geotechnical Engineering
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Visit to cochrane MRT station & tunnel
by: Shiong, Yeoh Jit, Ir.
Published: (2016) -
Technical visit to MRT cochrane underground station site
by: Kok, Jing Shun
Published: (2013) -
Numerical Analysis Of Tbm Tunnel Behaviour And Support Under High Stress Rock Masses In Pahang-Selangor Raw Water Transfer Tunnel
by: Heyam Hussein, Shaalan
Published: (2019) -
Microcrack pattern propagations and Rock Quality Designation of Batu Caves Limestone
by: Pauzi N.I.M., et al.
Published: (2023) -
Talk on Real Time Monitoring on MRT Tunnels
by: Ooi, Teik Aun, Ir. Dr.
Published: (2011)