Repowering of existing AL-Hartha gas-fuelled conventional steam power plant with molten salt cavity tubular solar central receiver
This paper introduces a new method to repower the existing equipment of the AL-Hartha steam plant located in Basra, Iraq, using a molten salt cavity tubular solar central receiver (SCR). Cycle Tempo is used to simulate the existing natural gas-fuelled conventional steam power cycle with consideratio...
Saved in:
Main Authors: | Jamel M.S., Abd Rahman A., Shamsuddin A.H. |
---|---|
Other Authors: | 55541995800 |
Format: | Article |
Published: |
Springer Verlag
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Novel integrations of molten salt cavity tubular solar central receiver with existing gas-fuelled conventional steam power plants
by: Jamel M.S., et al.
Published: (2023) -
Simulation of existing gas-fuelled conventional steam power plant using Cycle Tempo
by: Jamel M.S., et al.
Published: (2023) -
Parametric study of natural circulation flow in Molten Salt fuel in Molten Salt Reactor
by: Pauzi A.M., et al.
Published: (2023) -
Nusselt number prediction for oil and water in solar tubular cavity receivers
by: Reyhaneh, Loni, et al.
Published: (2022) -
Nusselt number prediction for oil and water in solar tubular cavity receivers
by: Loni, Reyhaneh, et al.
Published: (2022)