1000mw supercritical coal-fired power plant at Tanjung Bin to be delivered by Alstom
Link to publisher’s homepage at http://www.myiem.org.my/
Saved in:
Main Author: | Anon |
---|---|
Format: | Article |
Language: | English |
Published: |
The Institution of Engineers, Malaysia
2013
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/23098 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Environmental considerations for the 3 x 700MW coal-fired Manjung Project
by: Amir, Mahmud, et al.
Published: (2011) -
Parametric analysis and optimization of 660 MW supercritical power plant
by: Chandrakant Nikam K., et al.
Published: (2024) -
Talk on 'Construction and operational experience of a Malaysian power project: The 3x700MW Coal-Fired Manjung Deal'
by: Fathullah Razak, Ghazalli
Published: (2011) -
Analysis of 3E efficiencies (energy, economic and environmental) of coal-fired and gas power plant
by: Nabil Fikri bin Rodzman
Published: (2023) -
Handling efficiency of containers at port of Tanjung Pelepas, (PTP), Malaysia
by: Bin, Loke Keng
Published: (2011)