A case study on the determination of unused capacity using time driven activity-based costing for electronic component

Nowadays, demand for magnetic components are increasing from customer to support technological needs. It is important for the producer to incorporate an accurate cost estimation to decide the best price to gain better profits. However, actual costing structure is ignored the potential of time equati...

Full description

Saved in:
Bibliographic Details
Main Authors: N. F., Zamrud, S.N.A.M., Zaini, M. Y., Abu
Format: Article
Language:English
Published: Penerbit UMP 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/32392/7/A%20case%20study%20on%20the%20determination%20of%20unused.pdf
http://umpir.ump.edu.my/id/eprint/32392/
http://dx.doi.org/10.15282/ijets.7.2.2020.1006
http://dx.doi.org/10.15282/ijets.7.2.2020.1006
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.32392
record_format eprints
spelling my.ump.umpir.323922021-10-14T08:15:53Z http://umpir.ump.edu.my/id/eprint/32392/ A case study on the determination of unused capacity using time driven activity-based costing for electronic component N. F., Zamrud S.N.A.M., Zaini M. Y., Abu TS Manufactures Nowadays, demand for magnetic components are increasing from customer to support technological needs. It is important for the producer to incorporate an accurate cost estimation to decide the best price to gain better profits. However, actual costing structure is ignored the potential of time equation and capacity cost rate to measure the unused capacity from the resources allotment. The objective of this work is to determine the unused capacity in term of duration and cost in the manufacturing of electronic component using time-driven activity-based costing (TDABC). The method was developed using seven stages which are resources group identification, estimate cost of resources supplied, practical capacity estimation, capacity cost rates calculation, time equation development, determine time estimates for each sub-activity and estimate capacity cost required. As a result, in sub-activity-1 of the wire are winded using CNC machine, the unused time was 246,156.29 minutes which needs to be re-examined so that maximum time for productivity can be achieved and the unused capacity of cost was MYR 623,804.93 which conveys the message of wastage at the workstation. In sub-activity-3 of pick up the coils from flattening station, the amount of unused time and cost was -596,400 minutes and MYR -7,006,252.43 respectively. The negative value demonstrated that the operators are overworked than normal time allocation. In sub-activity 9 of arrange core on the magnetic strip, the amount of unused time was -596,400 minutes and MYR -7,006,252.43 for unused cost probably the job scopes were taking more time than it should to be completed. Therefore, by applying the TDABC method, the capacity utilization and time efficiency can be clearly viewed. Penerbit UMP 2020 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/32392/7/A%20case%20study%20on%20the%20determination%20of%20unused.pdf N. F., Zamrud and S.N.A.M., Zaini and M. Y., Abu (2020) A case study on the determination of unused capacity using time driven activity-based costing for electronic component. International Journal of Engineering Technology And Sciences (IJETS), 7 (2). pp. 74-85. ISSN 2289-697X http://dx.doi.org/10.15282/ijets.7.2.2020.1006 http://dx.doi.org/10.15282/ijets.7.2.2020.1006
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
N. F., Zamrud
S.N.A.M., Zaini
M. Y., Abu
A case study on the determination of unused capacity using time driven activity-based costing for electronic component
description Nowadays, demand for magnetic components are increasing from customer to support technological needs. It is important for the producer to incorporate an accurate cost estimation to decide the best price to gain better profits. However, actual costing structure is ignored the potential of time equation and capacity cost rate to measure the unused capacity from the resources allotment. The objective of this work is to determine the unused capacity in term of duration and cost in the manufacturing of electronic component using time-driven activity-based costing (TDABC). The method was developed using seven stages which are resources group identification, estimate cost of resources supplied, practical capacity estimation, capacity cost rates calculation, time equation development, determine time estimates for each sub-activity and estimate capacity cost required. As a result, in sub-activity-1 of the wire are winded using CNC machine, the unused time was 246,156.29 minutes which needs to be re-examined so that maximum time for productivity can be achieved and the unused capacity of cost was MYR 623,804.93 which conveys the message of wastage at the workstation. In sub-activity-3 of pick up the coils from flattening station, the amount of unused time and cost was -596,400 minutes and MYR -7,006,252.43 respectively. The negative value demonstrated that the operators are overworked than normal time allocation. In sub-activity 9 of arrange core on the magnetic strip, the amount of unused time was -596,400 minutes and MYR -7,006,252.43 for unused cost probably the job scopes were taking more time than it should to be completed. Therefore, by applying the TDABC method, the capacity utilization and time efficiency can be clearly viewed.
format Article
author N. F., Zamrud
S.N.A.M., Zaini
M. Y., Abu
author_facet N. F., Zamrud
S.N.A.M., Zaini
M. Y., Abu
author_sort N. F., Zamrud
title A case study on the determination of unused capacity using time driven activity-based costing for electronic component
title_short A case study on the determination of unused capacity using time driven activity-based costing for electronic component
title_full A case study on the determination of unused capacity using time driven activity-based costing for electronic component
title_fullStr A case study on the determination of unused capacity using time driven activity-based costing for electronic component
title_full_unstemmed A case study on the determination of unused capacity using time driven activity-based costing for electronic component
title_sort case study on the determination of unused capacity using time driven activity-based costing for electronic component
publisher Penerbit UMP
publishDate 2020
url http://umpir.ump.edu.my/id/eprint/32392/7/A%20case%20study%20on%20the%20determination%20of%20unused.pdf
http://umpir.ump.edu.my/id/eprint/32392/
http://dx.doi.org/10.15282/ijets.7.2.2020.1006
http://dx.doi.org/10.15282/ijets.7.2.2020.1006
_version_ 1715189883807465472
score 13.211869