Causes of project delay and cost overrun of mega projects in peninsular Malaysia
Project delay and cost overrun are two most commonly issues happen which tend to cause troubles in any construction project, especially the mega construction project. These two issues are generally regarded as the most problematic, complex, and risky issues encountered in a mega construction project...
Saved in:
Main Author: | Nur Aliya Najiha, Tamrin |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/31160/1/08.Causes%20of%20project%20delay%20and%20cost%20overrun%20of%20mega%20projects%20in%20peninsular%20Malaysia.pdf http://umpir.ump.edu.my/id/eprint/31160/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019) -
A review on causes of cost overrun in the construction projects
by: A. M., Faten Albtoush, et al.
Published: (2019) -
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects
by: B. Idrus, Arazi, et al.
Published: (2011) -
Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
by: C.T, Ramanathan, et al.
Published: (2014) -
Approaches in management of Construction delays and cost overrun of Multiple D&B Projects in Sabah
by: C.T, Ramanathan, et al.
Published: (2011)