Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
The emergence of Malaysia, the world’s leading palm oil producer, has driven the industry to thrive as never before. Recently, there are few issues happen in this plantation which are difficult to observe the establishment of time equation to interpret deviation of activities, the rate establishment...
Saved in:
Main Authors: | S. N. A. M., Zaini, Abu, Mohd Yazid |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Springer, Singapore
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/30983/1/publication4-RDU1903105.pdf http://umpir.ump.edu.my/id/eprint/30983/ https://doi.org/10.1007/978-981-15-9505-9_4 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023) -
Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
by: N. F. A., Ghani, et al.
Published: (2020) -
A case study on the determination of unused capacity using time driven activity-based costing for electronic component
by: N. F., Zamrud, et al.
Published: (2020) -
Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
by: S. N. A. M., Zaini, et al.
Published: (2020) -
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020)