Constructing a new cost structure using time-driven activity based costing for replanting at palm oil plantation
The palm oil industry in Malaysia is undeniably the pride of the country. However, in this plantation there are currently few issues which do not set up a time equation to interpret the variance of activities, the rate setting did not illustrate the correlation between the resources provided and the...
Saved in:
Main Authors: | Mohd Yazid, Abu, Sri Nur Areena, Mohd Zaini |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Malaysia Pahang
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/30714/9/Constructing%20a%20new%20cost%20structure%20using%20time-driven%20activity-based%20costing%20for%20replanting%20at%20palm%20oil%20plantation.pdf http://umpir.ump.edu.my/id/eprint/30714/ https://journal.ump.edu.my/ijets/article/view/4016/1114 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development a new costing structure using time driven activity-based costing for palm oil plantation
by: Mohd Yazid, Abu, et al.
Published: (2021) -
Development A New Costing Structure In Product And Service Operation Using Time Driven Activity based Costing
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022) -
A Review on Time-Driven Activity-Based Costing System in Various Sectors
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019) -
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023) -
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021)