A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge
Bridge are structures that require continual, arduous attentions and organized inspections in order to prevent calamity. Comprehensive preventative measures and maintenance that were invested will definitely help to diminish the cost incurred not only repair but also on other losses that might be ca...
Saved in:
Main Author: | Muhammad Fikri, Norsaidi |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/21463/1/06.A%20study%20of%20the%20level%20of%20satisfaction%20of%20user%20on%20bridge%20management%20system%20-%20case%20study%2C%20Penang%20Second%20Bridge.pdf http://umpir.ump.edu.my/id/eprint/21463/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The characteristics of a sustainable bridge : a case study of Second Penang Bridge
by: Ansari, Reza
Published: (2013) -
Bridge management system : review on current system and a case study
by: Noor Hidayah , Muhamad Jamil
Published: (2012) -
Geometric parametric study on concrete beam bridge
by: Nge, Siew Boon
Published: (2001) -
Construction of multiple design and build bridge projects: case study in Sabah
by: Chidambaram Ramanathan
Published: (2008) -
User benefit analysis of main pedestrian bridges in Kuantan Town Centre
by: Nor Aisahton, Junet
Published: (2012)