A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge

Bridge are structures that require continual, arduous attentions and organized inspections in order to prevent calamity. Comprehensive preventative measures and maintenance that were invested will definitely help to diminish the cost incurred not only repair but also on other losses that might be ca...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Fikri, Norsaidi
Format: Undergraduates Project Papers
Language:English
Published: 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/21463/1/06.A%20study%20of%20the%20level%20of%20satisfaction%20of%20user%20on%20bridge%20management%20system%20-%20case%20study%2C%20Penang%20Second%20Bridge.pdf
http://umpir.ump.edu.my/id/eprint/21463/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.21463
record_format eprints
spelling my.ump.umpir.214632023-03-13T02:54:52Z http://umpir.ump.edu.my/id/eprint/21463/ A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge Muhammad Fikri, Norsaidi HD28 Management. Industrial Management TG Bridge engineering Bridge are structures that require continual, arduous attentions and organized inspections in order to prevent calamity. Comprehensive preventative measures and maintenance that were invested will definitely help to diminish the cost incurred not only repair but also on other losses that might be caused due to structural collapse. Therefore, maintenance management is vital and greatly needed to sustain their functions for the safety of all users and in maintaining their comfort and confidence while using the bridge. With regards to this, a study on procedure and bridge inspection was conducted to identify damages in bridge structure and also gauge the level of satisfaction of users of the Penang Second Bridge. The data was collected via questionnaires develop for the bridge users and also the maintenance management unit of JKSB. Based on the case study, work maintenance on the bridge constitutes are routine maintenance, heavy repair work, upgrading work, and bridge inspection. JKSB maintenance management was using Integrated Asset Management System (IAMS) to maintain their bridge. The study identified the main damage on the bridge are pothole and spalling. It also showed that majority of the bridge users are satisfied with the maintenance work carried out. 2017-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/21463/1/06.A%20study%20of%20the%20level%20of%20satisfaction%20of%20user%20on%20bridge%20management%20system%20-%20case%20study%2C%20Penang%20Second%20Bridge.pdf Muhammad Fikri, Norsaidi (2017) A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic HD28 Management. Industrial Management
TG Bridge engineering
spellingShingle HD28 Management. Industrial Management
TG Bridge engineering
Muhammad Fikri, Norsaidi
A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge
description Bridge are structures that require continual, arduous attentions and organized inspections in order to prevent calamity. Comprehensive preventative measures and maintenance that were invested will definitely help to diminish the cost incurred not only repair but also on other losses that might be caused due to structural collapse. Therefore, maintenance management is vital and greatly needed to sustain their functions for the safety of all users and in maintaining their comfort and confidence while using the bridge. With regards to this, a study on procedure and bridge inspection was conducted to identify damages in bridge structure and also gauge the level of satisfaction of users of the Penang Second Bridge. The data was collected via questionnaires develop for the bridge users and also the maintenance management unit of JKSB. Based on the case study, work maintenance on the bridge constitutes are routine maintenance, heavy repair work, upgrading work, and bridge inspection. JKSB maintenance management was using Integrated Asset Management System (IAMS) to maintain their bridge. The study identified the main damage on the bridge are pothole and spalling. It also showed that majority of the bridge users are satisfied with the maintenance work carried out.
format Undergraduates Project Papers
author Muhammad Fikri, Norsaidi
author_facet Muhammad Fikri, Norsaidi
author_sort Muhammad Fikri, Norsaidi
title A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge
title_short A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge
title_full A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge
title_fullStr A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge
title_full_unstemmed A study of the level of satisfaction of user on bridge management system : case study, Penang Second Bridge
title_sort study of the level of satisfaction of user on bridge management system : case study, penang second bridge
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/21463/1/06.A%20study%20of%20the%20level%20of%20satisfaction%20of%20user%20on%20bridge%20management%20system%20-%20case%20study%2C%20Penang%20Second%20Bridge.pdf
http://umpir.ump.edu.my/id/eprint/21463/
_version_ 1761616571098202112
score 13.211869