Case on Integrated Time and Cost Monitoring of Construction Projects
The traditional approach of project time and cost performance measurement is generally based on direct monitoring in which there is a split-up between them. It does not truly relate the time versus cost performance of the project. Furthermore, this approach is not so much efficient to provide early...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Book Section |
Language: | English |
Published: |
Penerbit UMP
2017
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/19068/1/fim-2017-waris-Case%20on%20Integrated%20Time%20and%20Cost%20Monitoring%20of%20Construction%20Projects.pdf http://umpir.ump.edu.my/id/eprint/19068/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.ump.umpir.19068 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.190682017-11-15T01:19:07Z http://umpir.ump.edu.my/id/eprint/19068/ Case on Integrated Time and Cost Monitoring of Construction Projects M., Waris Panda, Sitansu HD28 Management. Industrial Management The traditional approach of project time and cost performance measurement is generally based on direct monitoring in which there is a split-up between them. It does not truly relate the time versus cost performance of the project. Furthermore, this approach is not so much efficient to provide early warning indicators and forecast future performance trends. As a remedy of these limitations in traditional monitoring practices, this case has proposed Earned Value Analysis (EVA) which integrates the work scope, cost and time to enable effective project performance measurement. Penerbit UMP Sorooshian, Shahryar 2017 Book Section PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/19068/1/fim-2017-waris-Case%20on%20Integrated%20Time%20and%20Cost%20Monitoring%20of%20Construction%20Projects.pdf M., Waris and Panda, Sitansu (2017) Case on Integrated Time and Cost Monitoring of Construction Projects. In: Collection of Teaching Cases for Business Administration Studies. Penerbit UMP, Kuantan, Pahang, pp. 22-25. ISBN 978-967-2054-50-4 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management M., Waris Panda, Sitansu Case on Integrated Time and Cost Monitoring of Construction Projects |
description |
The traditional approach of project time and cost performance measurement is generally based on direct monitoring in which there is a split-up between them. It does not truly relate the time versus cost performance of the project. Furthermore, this approach is not so much efficient to provide early warning indicators and forecast future performance trends. As a remedy of these limitations in traditional monitoring practices, this case has proposed Earned Value Analysis (EVA) which integrates the work scope, cost and time to enable effective project performance measurement. |
author2 |
Sorooshian, Shahryar |
author_facet |
Sorooshian, Shahryar M., Waris Panda, Sitansu |
format |
Book Section |
author |
M., Waris Panda, Sitansu |
author_sort |
M., Waris |
title |
Case on Integrated Time and Cost Monitoring of Construction Projects |
title_short |
Case on Integrated Time and Cost Monitoring of Construction Projects |
title_full |
Case on Integrated Time and Cost Monitoring of Construction Projects |
title_fullStr |
Case on Integrated Time and Cost Monitoring of Construction Projects |
title_full_unstemmed |
Case on Integrated Time and Cost Monitoring of Construction Projects |
title_sort |
case on integrated time and cost monitoring of construction projects |
publisher |
Penerbit UMP |
publishDate |
2017 |
url |
http://umpir.ump.edu.my/id/eprint/19068/1/fim-2017-waris-Case%20on%20Integrated%20Time%20and%20Cost%20Monitoring%20of%20Construction%20Projects.pdf http://umpir.ump.edu.my/id/eprint/19068/ |
_version_ |
1643668596104101888 |
score |
13.209306 |