Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
For construction projects, a delay occurs when the project is unable to be finished on time. In Malaysia, delay is an unavoidable issue that occurs in all phases of construction project. Presently, the majority of past research has concentrated on determining the reasons of or resolving delays in...
Saved in:
Main Author: | Wee Yeak, Ong |
---|---|
Format: | Thesis |
Published: |
2022
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/14124/1/Ong_Wee_Yeak.JPG http://studentsrepo.um.edu.my/14124/3/OngWeeYeak.pdf http://studentsrepo.um.edu.my/14124/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Causes of delay on highway construction project in Klang valley
by: Karunakaran S., et al.
Published: (2023) -
A study on the factor effecting project delay in the housing construction
by: Fatin Fazlinda, Hamzah
Published: (2016) -
Project management during covid-19: the relevance of human skills and the infrastructure project performance in Klang Valley Malaysia
by: Priyadarsini, Palaniapan
Published: (2023) -
Delay in infrastructure project
by: Siti Nurfarahin, Samsudin
Published: (2019) -
Prelimary studies of delays in construction projects
by: Tan, Chin Keng, et al.
Published: (2020)