Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak

For construction projects, a delay occurs when the project is unable to be finished on time. In Malaysia, delay is an unavoidable issue that occurs in all phases of construction project. Presently, the majority of past research has concentrated on determining the reasons of or resolving delays in...

Full description

Saved in:
Bibliographic Details
Main Author: Wee Yeak, Ong
Format: Thesis
Published: 2022
Subjects:
Online Access:http://studentsrepo.um.edu.my/14124/1/Ong_Wee_Yeak.JPG
http://studentsrepo.um.edu.my/14124/3/OngWeeYeak.pdf
http://studentsrepo.um.edu.my/14124/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.um.stud.14124
record_format eprints
spelling my.um.stud.141242023-02-07T22:15:06Z Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak Wee Yeak, Ong HD28 Management. Industrial Management For construction projects, a delay occurs when the project is unable to be finished on time. In Malaysia, delay is an unavoidable issue that occurs in all phases of construction project. Presently, the majority of past research has concentrated on determining the reasons of or resolving delays in the building phase; however, only a few studies have looked into delays in the planning and design phases. Thus, this study aims to to identify the factors that contributing to construction project delays in the planning and design phase, specially for the private housing projects. Quantitative research method is adopted as to meet the research objective. This research was conducted depend on the literature review and questionnaire survey. A questionnaire survey was conducted and delivered to respondents from architectural consultancy practice (ACP) registered with the Board of Architects Malaysia (LAM). Relative importance index (RII) analysis methods applied to justify the most critical delay factors for data analysis. Changes of client’s requirements was among the most critical causes of delay in the planning and design phases. The outcome of this research is good justification to propose some recommendations to mitigate delays for better performance of Malaysia’s private housing construction project. 2022-02 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/14124/1/Ong_Wee_Yeak.JPG application/pdf http://studentsrepo.um.edu.my/14124/3/OngWeeYeak.pdf Wee Yeak, Ong (2022) Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak. Masters thesis, Universiti Malaya. http://studentsrepo.um.edu.my/14124/
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Student Repository
url_provider http://studentsrepo.um.edu.my/
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Wee Yeak, Ong
Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
description For construction projects, a delay occurs when the project is unable to be finished on time. In Malaysia, delay is an unavoidable issue that occurs in all phases of construction project. Presently, the majority of past research has concentrated on determining the reasons of or resolving delays in the building phase; however, only a few studies have looked into delays in the planning and design phases. Thus, this study aims to to identify the factors that contributing to construction project delays in the planning and design phase, specially for the private housing projects. Quantitative research method is adopted as to meet the research objective. This research was conducted depend on the literature review and questionnaire survey. A questionnaire survey was conducted and delivered to respondents from architectural consultancy practice (ACP) registered with the Board of Architects Malaysia (LAM). Relative importance index (RII) analysis methods applied to justify the most critical delay factors for data analysis. Changes of client’s requirements was among the most critical causes of delay in the planning and design phases. The outcome of this research is good justification to propose some recommendations to mitigate delays for better performance of Malaysia’s private housing construction project.
format Thesis
author Wee Yeak, Ong
author_facet Wee Yeak, Ong
author_sort Wee Yeak, Ong
title Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
title_short Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
title_full Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
title_fullStr Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
title_full_unstemmed Architect’s perception of factors contributing to construction project delay In planning & design phase: Case studies of private housing projects In Klang Valley, Malaysia / Ong Wee Yeak
title_sort architect’s perception of factors contributing to construction project delay in planning & design phase: case studies of private housing projects in klang valley, malaysia / ong wee yeak
publishDate 2022
url http://studentsrepo.um.edu.my/14124/1/Ong_Wee_Yeak.JPG
http://studentsrepo.um.edu.my/14124/3/OngWeeYeak.pdf
http://studentsrepo.um.edu.my/14124/
_version_ 1758578801806147584
score 13.214268