Estimating for roadworks using lotus 1-2-3 / Dzulkifli Mohamad
There is no business skill of more importance to construction industry than estimating. Accurate estimates are necessary to the project owner, to the design team, and to construction team. Computer has long been recognised as having great potential in the area of construction estimating. This projec...
Saved in:
Main Author: | Mohamad, Dzulkifli |
---|---|
Format: | Student Project |
Language: | English |
Published: |
1990
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/99828/1/99828.pdf https://ir.uitm.edu.my/id/eprint/99828/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Permeable concrete in roadwork construction / Nurul Natasya Ahmad Sata
by: Ahmad Sata, Nurul Natasya
Published: (2018) -
Lotus 1-2-3 versi 2.4 WYSIWYG Lotus for windows
by: Goh, Ong Sing, et al.
Published: (1995) -
A dialogue with sacred lotus / Rozarina Johari
by: Johari, Rozarina
Published: (2021) -
Defect management during defect liability period (for roadwork) / Muhammad Zulkifli Abd Rahim
by: Abd Rahim, Muhammad Zulkifli
Published: (2018) -
Roadwork construction / Muhammad Azwan Arash Wan Salman
by: Wan Salman, Muhammad Azwan Arash
Published: (2019)