The determination of labour constant (productivity index) for construction process concreting works / Alias Hussin
An analytical approach for explaining the variability in labour intensive construction operations has been developed. Data has been collected daily from 3 sites. Not only productivity but many of the factors affecting it have been measured. The quantification of the impact of each individual factor...
Saved in:
Main Author: | Hussin, Alias |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1990
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/99618/1/99618.pdf https://ir.uitm.edu.my/id/eprint/99618/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The determination of labour constant (productivity index) for construction process formwork / Roslan Painudy
by: Painudy, Roslan
Published: (1991) -
Deflection behaviour of reinforced concrete beams / Khairuddin Sarpin and Razali Hussin
by: Sarpin, Khairuddin, et al.
Published: (1985) -
Removal of Chromium (VI) and Lead (II) by using sawdust activated carbon as compared with commercial activated carbon / Norlina Hussin
by: Hussin, Norlina
Published: (2009) -
Construction of reinforced concrete slab / Aiman Ahmad Zawawi
by: Ahmad Zawawi, Aiman
Published: (2017) -
Safety and health at construction site / Rabiatul Amira Alias
by: Alias, Rabiatul Amira
Published: (2013)