This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection...

Full description

Saved in:
Bibliographic Details
Main Author: Azmi, Musafri Abdullah
Format: Article
Language:English
Published: 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf
https://ir.uitm.edu.my/id/eprint/84132/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.84132
record_format eprints
spelling my.uitm.ir.841322024-11-26T07:52:45Z https://ir.uitm.edu.my/id/eprint/84132/ Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi Azmi, Musafri Abdullah Electric power distribution. Electric power transmission This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. This paper also using Bus power system distribution network and implement using protection equipment application in power system simulation programmed for planning, design and analysis of distributed system (PSS/Adept).This paper conclude by the result of study carried out O!! analysis protective relays configuration. 2010 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi. (2010) pp. 1-5.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Electric power distribution. Electric power transmission
spellingShingle Electric power distribution. Electric power transmission
Azmi, Musafri Abdullah
Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
description This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. This paper also using Bus power system distribution network and implement using protection equipment application in power system simulation programmed for planning, design and analysis of distributed system (PSS/Adept).This paper conclude by the result of study carried out O!! analysis protective relays configuration.
format Article
author Azmi, Musafri Abdullah
author_facet Azmi, Musafri Abdullah
author_sort Azmi, Musafri Abdullah
title Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_short Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_full Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_fullStr Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_full_unstemmed Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_sort overcurrent and earth fault relay setting and coordination using pss-adept : article / musafri abdullah azmi
publishDate 2010
url https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf
https://ir.uitm.edu.my/id/eprint/84132/
_version_ 1817847178993860608
score 13.244413