Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf https://ir.uitm.edu.my/id/eprint/84132/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.84132 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.841322024-11-26T07:52:45Z https://ir.uitm.edu.my/id/eprint/84132/ Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi Azmi, Musafri Abdullah Electric power distribution. Electric power transmission This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. This paper also using Bus power system distribution network and implement using protection equipment application in power system simulation programmed for planning, design and analysis of distributed system (PSS/Adept).This paper conclude by the result of study carried out O!! analysis protective relays configuration. 2010 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi. (2010) pp. 1-5. |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Electric power distribution. Electric power transmission |
spellingShingle |
Electric power distribution. Electric power transmission Azmi, Musafri Abdullah Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi |
description |
This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. This paper also using Bus power system distribution network and implement using protection equipment application in power system simulation programmed for planning, design and analysis of distributed system (PSS/Adept).This paper conclude by the result of study carried out O!! analysis protective relays configuration. |
format |
Article |
author |
Azmi, Musafri Abdullah |
author_facet |
Azmi, Musafri Abdullah |
author_sort |
Azmi, Musafri Abdullah |
title |
Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi |
title_short |
Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi |
title_full |
Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi |
title_fullStr |
Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi |
title_full_unstemmed |
Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi |
title_sort |
overcurrent and earth fault relay setting and coordination using pss-adept : article / musafri abdullah azmi |
publishDate |
2010 |
url |
https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf https://ir.uitm.edu.my/id/eprint/84132/ |
_version_ |
1817847178993860608 |
score |
13.244413 |