Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi

This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection...

Full description

Saved in:
Bibliographic Details
Main Author: Azmi, Musafri Abdullah
Format: Article
Language:English
Published: 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf
https://ir.uitm.edu.my/id/eprint/84132/
Tags: Add Tag
No Tags, Be the first to tag this record!