Criteria that’s needs of hydropower in Peninsular Malaysia / Zailani Sabaludin, Azidah Puteri Buang and Saidin Syazli Rosli
Basically, our report is about “criteria that's needed for a hydropower station in Peninsular Malaysia”. The purpose of this project to do a study on a feasibility of a location that has been pointed out to have a potential as a hydropower station. A part from that, it also produce electric pow...
Saved in:
Main Authors: | , , |
---|---|
Format: | Student Project |
Language: | English |
Published: |
1996
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/77024/1/77024.pdf https://ir.uitm.edu.my/id/eprint/77024/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|