Method for piling work in Tasek Kenyir / Mohd Safwan Roslam
Practical training is a course that should be completed by all students who took the final semester of Diploma in Building Surveying. Students can choose where company or palace to conduct the practical training. I have selected the state government departments of the TFC Time Future Construction. A...
Saved in:
Main Author: | Roslam, Mohd Safwan |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2013
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/63813/1/63813.pdf https://ir.uitm.edu.my/id/eprint/63813/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Endbearing pile: spun pile / Abdullah Zamzami Azaiz
by: Azaiz, Abdullah Zamzami
Published: (2015) -
Method construction of reinforcement concrete pile / Muhammad Faiz Yaacob
by: Yaacob, Muhammad Faiz
Published: (2013) -
Bored pile construction / Siti Arfah Mohd Radzuan
by: Mohd Radzuan, Siti Arfah
Published: (2012) -
Construction of cast in situ bored pile / Nurhamizah Md Anuar
by: Md Anuar, Nurhamizah
Published: (2012) -
The construction method for staircase and floor slab / Atiqah Wajihah Jaffri
by: Jaffri, Atiqah Wajihah
Published: (2021)