Method for piling work in Tasek Kenyir / Mohd Safwan Roslam
Practical training is a course that should be completed by all students who took the final semester of Diploma in Building Surveying. Students can choose where company or palace to conduct the practical training. I have selected the state government departments of the TFC Time Future Construction. A...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2013
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/63813/1/63813.pdf https://ir.uitm.edu.my/id/eprint/63813/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.63813 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.638132022-09-06T04:07:11Z https://ir.uitm.edu.my/id/eprint/63813/ Method for piling work in Tasek Kenyir / Mohd Safwan Roslam Roslam, Mohd Safwan TH Building construction Details in building design and construction.Including walls, roofs Construction equipment in building Practical training is a course that should be completed by all students who took the final semester of Diploma in Building Surveying. Students can choose where company or palace to conduct the practical training. I have selected the state government departments of the TFC Time Future Construction. As a place for the practical training. The site supervisor as a leader in this site had been appointed to be my supervisor during the training. During the practical training, I learned about the use of concrete in construction of apartments. For example, knowing that each type or grade of concrete, know the making and delivery of concrete to the construction site. Practical training will be end after four months the students complete the training. Finally, students will then prepare a report according to the topics that relevant to the work during the practical training that had been done. Universiti Teknologi MARA, Perak 2013 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/63813/1/63813.pdf Method for piling work in Tasek Kenyir / Mohd Safwan Roslam. (2013) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/63813.pdf> |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TH Building construction Details in building design and construction.Including walls, roofs Construction equipment in building |
spellingShingle |
TH Building construction Details in building design and construction.Including walls, roofs Construction equipment in building Roslam, Mohd Safwan Method for piling work in Tasek Kenyir / Mohd Safwan Roslam |
description |
Practical training is a course that should be completed by all students who took the final semester of Diploma in Building Surveying. Students can choose where company or palace to conduct the practical training. I have selected the state government departments of the TFC Time Future Construction. As a place for the practical training. The site supervisor as a leader in this site had been appointed to be my supervisor during the training. During the practical training, I learned about the use of concrete in construction of apartments. For example, knowing that each type or grade of concrete, know the making and delivery of concrete to the construction site. Practical training will be end after four months the students complete the training. Finally, students will then prepare a report according to the topics that relevant to the work during the practical training that had been done. |
format |
Monograph |
author |
Roslam, Mohd Safwan |
author_facet |
Roslam, Mohd Safwan |
author_sort |
Roslam, Mohd Safwan |
title |
Method for piling work in Tasek Kenyir / Mohd Safwan Roslam |
title_short |
Method for piling work in Tasek Kenyir / Mohd Safwan Roslam |
title_full |
Method for piling work in Tasek Kenyir / Mohd Safwan Roslam |
title_fullStr |
Method for piling work in Tasek Kenyir / Mohd Safwan Roslam |
title_full_unstemmed |
Method for piling work in Tasek Kenyir / Mohd Safwan Roslam |
title_sort |
method for piling work in tasek kenyir / mohd safwan roslam |
publisher |
Universiti Teknologi MARA, Perak |
publishDate |
2013 |
url |
https://ir.uitm.edu.my/id/eprint/63813/1/63813.pdf https://ir.uitm.edu.my/id/eprint/63813/ |
_version_ |
1744357216942555136 |
score |
13.188404 |