First and for most, this practical training report is about the dilapidation survey for condominium because there is a construction for condominium, but this dilapidation survey is carried just for post construction (piling work) construction work only which is appointed by Keller Contractor. This p...

Full description

Saved in:
Bibliographic Details
Main Author: Mod Ariffin, Muhammad Amin
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/61767/1/61767.pdf
https://ir.uitm.edu.my/id/eprint/61767/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.61767
record_format eprints
spelling my.uitm.ir.617672022-06-20T08:24:56Z https://ir.uitm.edu.my/id/eprint/61767/ Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin Mod Ariffin, Muhammad Amin TH Building construction Building inspection House construction First and for most, this practical training report is about the dilapidation survey for condominium because there is a construction for condominium, but this dilapidation survey is carried just for post construction (piling work) construction work only which is appointed by Keller Contractor. This practical training report have been divided by several part which is company background, literature review, case study, problem, suggestion and recommendation. In the first chapter will introduce to my company background in detail which is contain the background, location and also logo of company. I also put my director profile and several project that have been done by this company and on-going project. In this report, have literature review which is I have do some research and review regarding to the post construction that is piling work and dilapidation survey itself. This contain the type of defect, process involving during the dilapidation survey is carried out and also the process after the survey have been done. There is also a review about the piling work which is the step in piling work. After that, I start with my case study which is the dilapidation survey at Seri Duta 1 condominium, in this chapter I have put the detail on the location of our site and highlighted on the construction site and also dilapidation survey. There is also a brief about our client profile. The report that I have done is by area that means, I put all the defect by location for example common area, office and owner unit. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/61767/1/61767.pdf Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building inspection
House construction
spellingShingle TH Building construction
Building inspection
House construction
Mod Ariffin, Muhammad Amin
Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin
description First and for most, this practical training report is about the dilapidation survey for condominium because there is a construction for condominium, but this dilapidation survey is carried just for post construction (piling work) construction work only which is appointed by Keller Contractor. This practical training report have been divided by several part which is company background, literature review, case study, problem, suggestion and recommendation. In the first chapter will introduce to my company background in detail which is contain the background, location and also logo of company. I also put my director profile and several project that have been done by this company and on-going project. In this report, have literature review which is I have do some research and review regarding to the post construction that is piling work and dilapidation survey itself. This contain the type of defect, process involving during the dilapidation survey is carried out and also the process after the survey have been done. There is also a review about the piling work which is the step in piling work. After that, I start with my case study which is the dilapidation survey at Seri Duta 1 condominium, in this chapter I have put the detail on the location of our site and highlighted on the construction site and also dilapidation survey. There is also a brief about our client profile. The report that I have done is by area that means, I put all the defect by location for example common area, office and owner unit.
format Student Project
author Mod Ariffin, Muhammad Amin
author_facet Mod Ariffin, Muhammad Amin
author_sort Mod Ariffin, Muhammad Amin
title Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin
title_short Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin
title_full Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin
title_fullStr Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin
title_full_unstemmed Dilapidation survey on Seri Duta 1 Condominium for pre-construction / Muhammad Amin Mod Ariffin
title_sort dilapidation survey on seri duta 1 condominium for pre-construction / muhammad amin mod ariffin
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/61767/1/61767.pdf
https://ir.uitm.edu.my/id/eprint/61767/
_version_ 1736837364103249920
score 13.188404