Construction of lift core / Siti Nurqamarina Zarqa Zakaria
BSB 351 - Practical Training refers to work experience that is relevant to professional development prior to graduation. One of the requirements for the students of Diploma in Building Surveying to complete the program is the students must complete at least 16 weeks of Practical Training. It starte...
Saved in:
Main Author: | Zakaria, Siti Nurqamarina Zarqa |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/59867/1/59867.pdf https://ir.uitm.edu.my/id/eprint/59867/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Perceived of indoor environmental quality in missionary school / Siti Nurqamarina Zarqa Zakaria and Intan Bayani Zakaria
by: Zakaria, Siti Nurqamarina Zarqa, et al.
Published: (2018) -
Kerja-kerja penanaman cerucuk konkrit bertetulang segiempat tepat / Nor Azlaily Zakaria
by: Zakaria, Nor Azlaily
Published: (2007) -
Installation of waterproofing system at Putra heights / Ahmad Syahmi Kamaruzaman
by: Kamaruzaman, Ahmad Syahmi
Published: (2017) -
The fracture mechanism of prestressed concrete sleepers subjected to linear and variable harmonic functions / Mohd Ikmal Fazlan Rozli@Rosli
by: Rozli@Rosli, Mohd Ikmal Fazlan
Published: (2020) -
Evaluation of physical properties of autoclaved aerated concrete (AAC) based glass-gypsum waste into concrete / Izzati Abdul Manaf … [et al.]
by: Abdul Manaf, Izzati, et al.
Published: (2022)