Construction of lift core / Siti Nurqamarina Zarqa Zakaria

BSB 351 - Practical Training refers to work experience that is relevant to professional development prior to graduation. One of the requirements for the students of Diploma in Building Surveying to complete the program is the students must complete at least 16 weeks of Practical Training. It starte...

Full description

Saved in:
Bibliographic Details
Main Author: Zakaria, Siti Nurqamarina Zarqa
Format: Student Project
Language:English
Published: 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/59867/1/59867.pdf
https://ir.uitm.edu.my/id/eprint/59867/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.59867
record_format eprints
spelling my.uitm.ir.598672022-05-31T02:52:26Z https://ir.uitm.edu.my/id/eprint/59867/ Construction of lift core / Siti Nurqamarina Zarqa Zakaria Zakaria, Siti Nurqamarina Zarqa TH Building construction Building fittings and their installation BSB 351 - Practical Training refers to work experience that is relevant to professional development prior to graduation. One of the requirements for the students of Diploma in Building Surveying to complete the program is the students must complete at least 16 weeks of Practical Training. It started on 30th November 2015 and end on 30th March 2016. During the 4 months of practical training at Zikay Group Sdn. Bhd, Kampung Baru, Kuala Lumpur, have learned how theory and practical can be combined together in useful ways and how remarkable and enjoyable practical training could be. There are many type of maintenance and construction work have done while in Kembang Serantau team in Mercu Zikay. A part of this, renovation works also give a new and different knowledge about construction works. This high rise building in Mercu Zikay, have parking lot from level 1 until level 12 and hotels and apartments until level 40. At the roof top of the building, there are helipad provided. Objectives that can be achieve are such as to adapt to the dynamic working atmosphere and for apply the academic knowledge in managing workplace challenges. Next, it is also for apply the experience gained in the practical training for future learning in the university. With a lot of experiences, construction of elevator core has been chosen as case study for this report as it is also a part from study on last semester 4 in Building Services. Through practical training, trainee has gain an exposure to systematic work condition an environment that is conductive coupled with friendly staff that are always there to help. Hoping all of knowledge that has been gained can be use and help in future. 2016 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/59867/1/59867.pdf Construction of lift core / Siti Nurqamarina Zarqa Zakaria. (2016) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Building fittings and their installation
spellingShingle TH Building construction
Building fittings and their installation
Zakaria, Siti Nurqamarina Zarqa
Construction of lift core / Siti Nurqamarina Zarqa Zakaria
description BSB 351 - Practical Training refers to work experience that is relevant to professional development prior to graduation. One of the requirements for the students of Diploma in Building Surveying to complete the program is the students must complete at least 16 weeks of Practical Training. It started on 30th November 2015 and end on 30th March 2016. During the 4 months of practical training at Zikay Group Sdn. Bhd, Kampung Baru, Kuala Lumpur, have learned how theory and practical can be combined together in useful ways and how remarkable and enjoyable practical training could be. There are many type of maintenance and construction work have done while in Kembang Serantau team in Mercu Zikay. A part of this, renovation works also give a new and different knowledge about construction works. This high rise building in Mercu Zikay, have parking lot from level 1 until level 12 and hotels and apartments until level 40. At the roof top of the building, there are helipad provided. Objectives that can be achieve are such as to adapt to the dynamic working atmosphere and for apply the academic knowledge in managing workplace challenges. Next, it is also for apply the experience gained in the practical training for future learning in the university. With a lot of experiences, construction of elevator core has been chosen as case study for this report as it is also a part from study on last semester 4 in Building Services. Through practical training, trainee has gain an exposure to systematic work condition an environment that is conductive coupled with friendly staff that are always there to help. Hoping all of knowledge that has been gained can be use and help in future.
format Student Project
author Zakaria, Siti Nurqamarina Zarqa
author_facet Zakaria, Siti Nurqamarina Zarqa
author_sort Zakaria, Siti Nurqamarina Zarqa
title Construction of lift core / Siti Nurqamarina Zarqa Zakaria
title_short Construction of lift core / Siti Nurqamarina Zarqa Zakaria
title_full Construction of lift core / Siti Nurqamarina Zarqa Zakaria
title_fullStr Construction of lift core / Siti Nurqamarina Zarqa Zakaria
title_full_unstemmed Construction of lift core / Siti Nurqamarina Zarqa Zakaria
title_sort construction of lift core / siti nurqamarina zarqa zakaria
publishDate 2016
url https://ir.uitm.edu.my/id/eprint/59867/1/59867.pdf
https://ir.uitm.edu.my/id/eprint/59867/
_version_ 1735389641156067328
score 13.160551