Keretapi Tanah Melayu Berhad / Sharul Aiman Samsudin, Ahmad Dzulkifli and Muhammad Aizuddin Mohd Alias
a. Background Of The Study This study focusing on the • effieciency of the system and the operation. • Connectivity of the rail line to improve the tourism sector b. Problem Statement Comman problem with KTMB are: i. Service Inefficiencies Timeliness factor The KTMB train has a problem with...
Saved in:
Main Authors: | , , |
---|---|
Format: | Entrepreneurship Project |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/50035/1/50035.pdf https://ir.uitm.edu.my/id/eprint/50035/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | a. Background Of The Study
This study focusing on the
• effieciency of the system and the operation.
• Connectivity of the rail line to improve the tourism sector
b. Problem Statement
Comman problem with KTMB are:
i. Service Inefficiencies
Timeliness factor
The KTMB train has a problem with the delay of their train. This delay will cause:
• Crowded station
• Pasanger do not know the new train schedule
• Pasanger cannot re-route their new journey |
---|