Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
This report is all about the information of my case study through practical training under company Kenwingston Sdn. Bhd. during the four months of practical training. The topic I have choose to complete my practical training report is homebuyer responsibilities in the context of defect liability per...
Saved in:
Main Author: | Abdul Aziz, Siti Nur Fadiah |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2018
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/49437/1/49437.pdf https://ir.uitm.edu.my/id/eprint/49437/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Higher educational building defects in Perak / Muhammad Syafiq Muhd Rozi and Noraini Md Zain
by: Muhd Rozi, Muhammad Syafiq, et al.
Published: (2019) -
Inspection for defects at boarding building at SMK Sultan Muhammad Shah, Parit Perak / Adilynne Endau Kaneddy
by: Kaneddy, Adilynne Endau
Published: (2014) -
Defect inspection during defect liability period : housing project Elvina Type at Bandar Sri Sendayan / Muhammad Shaffi Abdol Johar
by: Abdol Johar, Muhammad Shaffi
Published: (2018) -
A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
by: Abdul Wahab, Marlia
Published: (2009) -
Design maintenance for lighthouse / Muhamad Rashid Ab Aziz
by: Ab Aziz, Muhamad Rashid
Published: (2009)