Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz

This report is all about the information of my case study through practical training under company Kenwingston Sdn. Bhd. during the four months of practical training. The topic I have choose to complete my practical training report is homebuyer responsibilities in the context of defect liability per...

Full description

Saved in:
Bibliographic Details
Main Author: Abdul Aziz, Siti Nur Fadiah
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2018
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/49437/1/49437.pdf
https://ir.uitm.edu.my/id/eprint/49437/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.49437
record_format eprints
spelling my.uitm.ir.494372021-08-31T15:56:34Z https://ir.uitm.edu.my/id/eprint/49437/ Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz Abdul Aziz, Siti Nur Fadiah Maintenance and repair Contractors Building inspection Building failures, errors, defects, etc. Building fittings and their installation Maintenance and repair This report is all about the information of my case study through practical training under company Kenwingston Sdn. Bhd. during the four months of practical training. The topic I have choose to complete my practical training report is homebuyer responsibilities in the context of defect liability period. This report has five (5) chapter which include all information about the company, theoretical study/literature review about the topic that I choose, information about my case study based on the topic that I choose, problems and recommendations that have been analyse, and last but not least is conclusion of the my practical training report. The first chapter is details of information of the company. In this chapter, all the general information about the background of the company, the company director’s profile that managing the company and the organization that always support director to manage the company. It also content of the objective, vision, mission, and company corporate culture for clients, employees, company and collaboration and company certificate. This chapter including key plan, location plan, and site plan of the company to know where the headquarters of the company located. The second chapter is all about the general information for the topic that have been chosen which is in the context of theoretical study/literature review. In this chapter, information was collected from the articles, books, and on internets that related to the topic. This chapter content of introduction of the chapter, details of defect liability periods, and it’s objectives and procedure. Also, there is general information of the main topic which is homebuyer responsibilities during defect liability periods including the Homebuyer Tribunal and added some of the information about contractor responsibilities. The third chapter is about case study on the topic of defect liability periods and the introduction of the case study. In this chapter, there is overview of defect liability periods and it’s procedures that implement on site. Also the main topic of purchaser responsibilities of case study and last but not least is summary of the chapter. The forth chapter is about the problems and recommendations based on the case study. Then, the last chapter is about the conclusion of the main topic which is purchaser responsibilities in the context of defect liability periods base on the case study. This report also include the references and appendices that have been used in this report. Universiti Teknologi Mara, Perak 2018 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/49437/1/49437.pdf ID49437 Abdul Aziz, Siti Nur Fadiah (2018) Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz. Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Maintenance and repair
Contractors
Building inspection
Building failures, errors, defects, etc.
Building fittings and their installation
Maintenance and repair
spellingShingle Maintenance and repair
Contractors
Building inspection
Building failures, errors, defects, etc.
Building fittings and their installation
Maintenance and repair
Abdul Aziz, Siti Nur Fadiah
Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
description This report is all about the information of my case study through practical training under company Kenwingston Sdn. Bhd. during the four months of practical training. The topic I have choose to complete my practical training report is homebuyer responsibilities in the context of defect liability period. This report has five (5) chapter which include all information about the company, theoretical study/literature review about the topic that I choose, information about my case study based on the topic that I choose, problems and recommendations that have been analyse, and last but not least is conclusion of the my practical training report. The first chapter is details of information of the company. In this chapter, all the general information about the background of the company, the company director’s profile that managing the company and the organization that always support director to manage the company. It also content of the objective, vision, mission, and company corporate culture for clients, employees, company and collaboration and company certificate. This chapter including key plan, location plan, and site plan of the company to know where the headquarters of the company located. The second chapter is all about the general information for the topic that have been chosen which is in the context of theoretical study/literature review. In this chapter, information was collected from the articles, books, and on internets that related to the topic. This chapter content of introduction of the chapter, details of defect liability periods, and it’s objectives and procedure. Also, there is general information of the main topic which is homebuyer responsibilities during defect liability periods including the Homebuyer Tribunal and added some of the information about contractor responsibilities. The third chapter is about case study on the topic of defect liability periods and the introduction of the case study. In this chapter, there is overview of defect liability periods and it’s procedures that implement on site. Also the main topic of purchaser responsibilities of case study and last but not least is summary of the chapter. The forth chapter is about the problems and recommendations based on the case study. Then, the last chapter is about the conclusion of the main topic which is purchaser responsibilities in the context of defect liability periods base on the case study. This report also include the references and appendices that have been used in this report.
format Monograph
author Abdul Aziz, Siti Nur Fadiah
author_facet Abdul Aziz, Siti Nur Fadiah
author_sort Abdul Aziz, Siti Nur Fadiah
title Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
title_short Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
title_full Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
title_fullStr Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
title_full_unstemmed Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
title_sort defect liability period, dlp (home buyer responsibilities) / siti nur fadiah abdul aziz
publisher Universiti Teknologi Mara, Perak
publishDate 2018
url https://ir.uitm.edu.my/id/eprint/49437/1/49437.pdf
https://ir.uitm.edu.my/id/eprint/49437/
_version_ 1709671414033809408
score 13.15806