Defect liability period, DLP (contractor responsibilities) / Abdillah Azizi Abdul Mu’en
Practical Training Report is the most important report that should be prepared by the Practical Training Student of AP 119 Program. The report of the practical training require the student to study and analyze the topic that they select at their selected case study/company. The student shall then re...
Saved in:
Main Author: | Abdul Mu’en, Abdillah Azizi |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi Mara, Perak
2018
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/48779/1/48779.pdf http://ir.uitm.edu.my/id/eprint/48779/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The study on problems during defects liability period [DLP] / Rosli Abu Huraya
by: Abu Huraya, Rosli
Published: (2009) -
Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz
by: Abdul Aziz, Siti Nur Fadiah
Published: (2018) -
A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
by: Che Zulkifli, Zarul Azkief
Published: (2009) -
Smart Technologies (ST) application in identifying mould growth defects in defect management works for operated heritage buildings in Penang, Malaysia: a pilot survey / Ahmad Mu’az Ahmad, Nur Azfahani Ahmad and Mohd Azian Zaidi
by: Ahmad, Ahmad Mu’az, et al.
Published: (2022) -
Building quality inspection for vacant possession / Syabil Arissa Azizi
by: Azizi, Syabil Arissa
Published: (2018)