Maintenance work for air-conditioning system and cooling tower at Pantai Hospital Manjung / Muhamad Naquib Halmi

The practical training takes 4 months to complete the study taking the diploma as a Building Surveyor. The maintenance programme that applied at this Hospital was systematically for this building. The services of this building are well-maintained. Thoroughly, the subject that had been chosen for pra...

Full description

Saved in:
Bibliographic Details
Main Author: Halmi, Muhamad Naquib
Format: Monograph
Language:English
Published: Universiti Teknologi Mara, Perak 2017
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/46361/1/46361.pdf
http://ir.uitm.edu.my/id/eprint/46361/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The practical training takes 4 months to complete the study taking the diploma as a Building Surveyor. The maintenance programme that applied at this Hospital was systematically for this building. The services of this building are well-maintained. Thoroughly, the subject that had been chosen for practical reports are maintenance of cooling tower and air-conditioning The problems in this building only is air-conditioning due the temperature is not cold. This department receive many complaints from the Operation Theatre (OT) that the people inside the department is hot. so this department had decided to run 2 chiller for one day starts from 6.00 am – 5.30 pm.