The low heat cement concrete : pile caps / Siti Nor Adilah Saudi
This report is briefly explained based on the case study of types and installation method of the pile cap of the Blok 8 construction site at SUK (‘Setiausaha Kerajaan Kelantan’). Pile caps construction is usually done at the preliminaries stage of construction. The construction of the pile caps is r...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/44844/1/44844.pdf http://ir.uitm.edu.my/id/eprint/44844/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|