The low heat cement concrete : pile caps / Siti Nor Adilah Saudi

This report is briefly explained based on the case study of types and installation method of the pile cap of the Blok 8 construction site at SUK (‘Setiausaha Kerajaan Kelantan’). Pile caps construction is usually done at the preliminaries stage of construction. The construction of the pile caps is r...

Full description

Saved in:
Bibliographic Details
Main Author: Saudi, Siti Nor Adilah
Format: Student Project
Language:English
Published: 2014
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/44844/1/44844.pdf
http://ir.uitm.edu.my/id/eprint/44844/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.44844
record_format eprints
spelling my.uitm.ir.448442021-04-14T04:06:10Z http://ir.uitm.edu.my/id/eprint/44844/ The low heat cement concrete : pile caps / Siti Nor Adilah Saudi Saudi, Siti Nor Adilah Materials of engineering and construction Cement, lime, mortar, etc. Concrete This report is briefly explained based on the case study of types and installation method of the pile cap of the Blok 8 construction site at SUK (‘Setiausaha Kerajaan Kelantan’). Pile caps construction is usually done at the preliminaries stage of construction. The construction of the pile caps is related to the choice of building material used as foundation. This report is produced through my practical training experience while placed at construction site to build a Commercials building at Kota Bharu, Kelantan. This report has been divided into sections as to ease reader to understand the detail steps on installation methods and the choice made for material of the pile caps. The sections start from the introduction, company background, theoretical reviews, the types of pile cap used, method of installation, problems occurred and conclusion as the summary. Methodology of study obtained from the theoretical reviews on books, journals and resources from web. The case study is basically done by the observation and the interviews from the site supervisor and suppliers. Based on the study, as the contractor the pile cap work is proceed according to bill of quantities prepared by consultant and reference to the clauses contained in contract agreement. Finishing work is important as it influence the physical view of the completed building and its aesthetics value. 2014 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/44844/1/44844.pdf Saudi, Siti Nor Adilah (2014) The low heat cement concrete : pile caps / Siti Nor Adilah Saudi. [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Materials of engineering and construction
Cement, lime, mortar, etc.
Concrete
spellingShingle Materials of engineering and construction
Cement, lime, mortar, etc.
Concrete
Saudi, Siti Nor Adilah
The low heat cement concrete : pile caps / Siti Nor Adilah Saudi
description This report is briefly explained based on the case study of types and installation method of the pile cap of the Blok 8 construction site at SUK (‘Setiausaha Kerajaan Kelantan’). Pile caps construction is usually done at the preliminaries stage of construction. The construction of the pile caps is related to the choice of building material used as foundation. This report is produced through my practical training experience while placed at construction site to build a Commercials building at Kota Bharu, Kelantan. This report has been divided into sections as to ease reader to understand the detail steps on installation methods and the choice made for material of the pile caps. The sections start from the introduction, company background, theoretical reviews, the types of pile cap used, method of installation, problems occurred and conclusion as the summary. Methodology of study obtained from the theoretical reviews on books, journals and resources from web. The case study is basically done by the observation and the interviews from the site supervisor and suppliers. Based on the study, as the contractor the pile cap work is proceed according to bill of quantities prepared by consultant and reference to the clauses contained in contract agreement. Finishing work is important as it influence the physical view of the completed building and its aesthetics value.
format Student Project
author Saudi, Siti Nor Adilah
author_facet Saudi, Siti Nor Adilah
author_sort Saudi, Siti Nor Adilah
title The low heat cement concrete : pile caps / Siti Nor Adilah Saudi
title_short The low heat cement concrete : pile caps / Siti Nor Adilah Saudi
title_full The low heat cement concrete : pile caps / Siti Nor Adilah Saudi
title_fullStr The low heat cement concrete : pile caps / Siti Nor Adilah Saudi
title_full_unstemmed The low heat cement concrete : pile caps / Siti Nor Adilah Saudi
title_sort low heat cement concrete : pile caps / siti nor adilah saudi
publishDate 2014
url http://ir.uitm.edu.my/id/eprint/44844/1/44844.pdf
http://ir.uitm.edu.my/id/eprint/44844/
_version_ 1698700275468992512
score 13.160551